WIRING DIAGRAM
CONTRACTOR _________________________ PURCHASER _____________________________________________
ORDER NO. ____________________________ JOB NAME ________________________________________________
JCI CONTRACT NO. _____________________ LOCATION ________________________________________________
JCI ORDER NO. _________________________ ENGINEER _______________________________________________
REFERENCE DATE ________ APPROVAL DATE ________
CONSTRUCTION DATE _______
Supersedes: 160.79-PW2 (616)
Form: 160.79-PW2 (119)
FIELD CONTROL MODIFICATIONS
FOR YD CHILLER (STYLE D)
WITH OPTIVIEW CONTROL CENTER
Issue Date:
January 31, 2019
JOB DATA:
CHILLER MODEL NO. YD _________________
NO. OF UNITS __________________________
TYPE OF STARTING _____________________
Included by Johnson Controls for Field Installation (by others) are:
YES NO Per Unit
Chilled Water Flow Switch
Condenser Water Flow Switch
_______________________________________________________________
_______________________________________________________________