MAINTENANCE

MOTOR

The blower motor should be cleaned annually and if it 

has oiling ports, it should be oiled with a good grade of 

SAE 20 oil. Normally a few drops of oil in each bearing 

is sufficient.

COIL

The coil must be kept clean by any of the following 

methods.
 1.   Cleaning with low-pressure compressed air.
 2.   Flushing or rinsing with water (a detergent is ad-

visable for greasy surfaces).

 3.   Prior to the water system start-up and balancing, the 

chilled/hot water systems should be flushed to clean 

out dirt and debris, which may have accumulated 

during construction. All unit service valves are to 

be closed during this process. Strainers are to be 

installed in the piping mains to prevent this material 

from entering the units during normal operation.

FILTERS

The  intervals  at  which  filters  require  replacement 

depend on local conditions.

Tele. 800-861-1001

www.York.com

P.O. Box 1592, York, Pennsylvania USA  17405-1592 

Subject to change without notice. Printed in USA

Copyright © by York International Corporation 2004 

ALL RIGHTS RESERVED

Form 115.20-NOM2 (105) 
Supercedes 115.20-NOM2 (904) 

Because of dust and lint in the room, room-air filters 

load  up  much  more  rapidly  than  outdoor-air  filters.  

Under normal conditions, the room air filter requires 

replacement every six to eight weeks.
To ensure proper maintenance of the filters, it is best 

to follow an organized maintenance procedure.  The 

following one is recommended:
Divide the total number of units on the job into six 

equal groups.  Each week inspect, clean or replace the 

filters in each group, in rotation.  This insures a uniform 

servicing interval.  The interval may be lengthened or 

shortened as determined by experience.  If inspection 

shows only the room-air filter to be dirty, this one alone 

should be replaced.

Dirty filters reduce the air and heat-

ing capacities of the Unit Ventilator.  

When the filters are excessively dirty, 

the unit heating capacity will be so re-

duced that it is ineffective for heating 

the room.  When a room fails to heat, 

always check the filters.

CLEAN UNIT INTERIOR

Once  a  year  clean  the  fans  and  coils  of  the  unit 

thoroughly.  Remove the access panel as necessary.

Wipe the interior of the unit clean with a rag.  Wipe the 

motor and inside and outside of the fan housings.  (In 

cooling units, clean out the drain pan.)

Clean or Replace Air Filters Regu-

larly

Summary of Contents for YCHBC

Page 1: ...enum and Filter MODEL YPHH Ceiling Concealed Model with Electric Heat Insulated Return Plenum and Filter MODEL YCHBC Ceiling Cabinet Model MODEL YRHBC Telescoping Recessed Ceiling Model MODEL YHYB High Capacity Ceiling Concealed Model MODEL YPHYB High Capacity Ceiling Concealed Model with Insulated Return Plenum and Filter Notes 1 2 Pipe units have one water coil 4 Pipe units have two water coils ...

Page 2: ...ing right and left hand units PLENUM OPTIONAL RECEIVING 3 STORAGE 3 PREPARE CEILING FOR MOUNTING 3 WIRING 3 PIPING 6 DRAIN PIPING 7 DRAWINGS 8 14 STARTUP 15 MAINTENANCE 16 Reference Documents IOM for YVC YVF YVS Form 115 20 NOM3 Latest IOM for YSHW YSHX Form115 22 NOM5 Latest IOM for YSVW YSVX Form 115 22 NOM2 Latest Parts List Form 115 20 RP2 Latest These documents can be ordered through Publicat...

Page 3: ...ntended for horizontal exposed surface mounting Unit must not be operated during building construction due to ex cessive airborne dust and debris The units must not be operated under any circumstances without an air filter in place WIRING All wiring must comply with the local and national code requirements Units are provided with wiring diagrams and nameplate data to provide information required f...

Page 4: ...INSTALLATION 4 YORK INTERNATIONAL FORM 115 20 NOM2 105 FIG 2 HORIZONTAL UNITS TYPICAL WIRING LD010198 ...

Page 5: ... Cool Fan Auto On 24V Manual changeover 6 Wire Thermostat R G O Y W B Adj Heat Fixed Cool Anticipator Fixed Cooling Anticipator Fan Cycling O B can be used for cool and heat relays respectively or for cool heat water valves T200 THERMOSTAT OPTION W CONTROLLER Heat Off Cool Fan On 24V Manual changeover 7 Wire Thermostat R C Hi Med Lo 24V Heat 24V Coil Auto fan speed control digital readout auto ove...

Page 6: ...st be made for expansion and con traction of piping systems All horizontal and vertical risers including runouts must be able to withstand significant movement with temperature changes Failure to do so will result in damage and failure of piping fittings and valves throughout the building 9 Never insulate the heads or motorized portion of control valves Damage can occur in the form of excessive he...

Page 7: ...ully open and close without interference to other valves ceiling wall plenum or other accessories 3 All valves will operate at any angle with the excep tion of the motorized valve which must be installed with the power head above horizontal The actuator box requires a 3 4 clearance for removal FIG 5 3 WAY MOTORIZED VALVE ASSEMBLY 00187VIP FIG 4 2 WAY MOTORIZED VALVE ASSEMBLY 00186VIP DRAIN PIPING ...

Page 8: ...7 1 4 43 1 4 49 1 4 56 1 4 20 1 8 26 1 8 30 1 8 30 1 8 36 1 8 42 1 8 49 1 8 25 1 4 31 1 4 35 1 4 35 1 4 41 1 4 47 1 4 54 1 4 HBC Horizontal Blower Coil Ceiling Concealed Model MODEL YHBC 6 YP HBC 126 3 RH Filter Note YHBC units are not available with filters YHBC units can be field converted YHBC to YPHBC by adding an accessory plenum See instruction below for details on field conversion FIELD CON...

Page 9: ... 1 8 37 1 4 10 X 34 X 1 6YPHBC 34 32 30 1 8 40 1 8 37 1 4 10 X 34 X 1 8YPHBC 40 38 36 1 8 46 1 8 43 1 4 10 X 40 X 1 10YPHBC 46 44 42 1 8 52 1 8 49 1 4 10 X 46 X 1 13YPHBC 53 51 49 1 8 59 1 8 56 1 4 10 X 53 X 1 1 Return plenums are insulated 2 YPHBC units are provided with filters in the plenum 3 Standard plenums are end return and can be field converted to bottom return by trading the blockoff and...

Page 10: ...NTING WIDTH B SUPPLY LOUVERED PANEL WIDTH C RETURN LOUVERED PANEL WIDTH E FILTER SIZE INCL 3YCHBC 38 34 26 31 1 2 10 X 37 X1 4YCHBC 44 40 31 1 2 37 10 X 43 X1 5YCHBC 48 44 37 42 1 2 10 X 46 X1 6YCHBC 48 44 37 42 1 2 10 X 46 X1 8YCHBC 54 50 42 1 2 48 10 X 53 X1 10YCHBC 60 56 48 53 10 X 59 X1 13YCHBC 67 63 53 58 1 2 10 X 65 X1 LD010230 ...

Page 11: ...L DIMENSIONS Inches MODEL PANEL WIDTH A UNIT WIDTH B SUPPLY OPENING C LOUVERED PANEL WIDTH E MOUNTING WIDTH H RETURN OPENING I FILTER SIZE INCL 3YRHBC 41 38 3 8 29 36 5 8 35 14 10 x 37 x 1 4YRHBC 47 44 3 8 35 41 3 4 41 20 10 x 43 x 1 5YRHBC 51 48 3 8 39 47 1 4 45 24 10 x 47 5 x 1 6YRHBC 51 48 3 8 39 47 1 4 45 24 10 x 47 5 x 1 8YRHBC 57 54 3 8 45 52 1 2 51 30 10 x 53 x 1 10YRHBC 67 60 3 8 51 57 7 8...

Page 12: ...ipe Coil 3 Row 4 2 Pipe Coil 4 Row Voltage 1 240 1 60 2 208 1 60 3 277 1 60 Electric Heat kW 6 0 kW 10 0 kW Ceiling Concealed Model with Electric Heat MODEL YHH Notes 1 Fuse size and wire size per ampacities on unit nameplate Follow NEC guidelines in absence of local codes 2 YHH units are not available with filters PHYSICAL DIMENSIONS INCHES MODEL OVERALL WIDTH A MOUNTING WIDTH B SUPPLY OPENING C ...

Page 13: ... MODEL OVERALL WIDTH A MOUNTING WIDTH B SUPPLY OPENING C PLENUM WIDTH D RETURN OPENING E FILTER INCL 3YPHHS 25 19 11 16 15 20 18 10 X 20 X 1 4YPHHS 6YPHHS 6YPHH 8YPHH 40 34 11 16 30 34 32 10 X 34 X 1 10YPHH 46 40 11 16 36 40 38 10 X 40 X 1 12YPHH 52 46 11 16 42 46 44 10 X 46 X 1 YPHH FEATURES 1 Return Plenums are insulated 2 All plenums include throw away filter LD010231 ...

Page 14: ...il 3 Row 4 2 Pipe Coil 4 Row 6 2 Pipe Coil 6 Row 31 4 Pipe Coil 3 Row Cool 1 Row Heat 32 4 Pipe Coil 3 Row Cool 2 Row Heat 41 4 Pipe Coil 4 Row Cool 1 Row Heat 42 4 Pipe Coil 4 Row Cool 2 Row Heat 61 4 Pipe Coil 6 Row Cool 1 Row Heat 62 4 Pipe Coil 6 Row Cool 2 Row Heat LD04781 MODEL YHYB High Capacity Ceiling Concealed Model PHYSICAL DIMENSIONS INCHES MODEL OVERALL WIDTH A TOP PLATE WIDTH B SUPPL...

Page 15: ...rk is complete and available for full air flow Unit installed level to ensure proper drainage and operation Unit installed with proper clearances Ensure condensate water will drain toward the drain connection An overflow drain may be required as a back up to a clogged primary drain Check that coil s valves and piping have been leak checked and insulated as required Main coil drain pan must be prop...

Page 16: ...cedes 115 20 NOM2 904 Because of dust and lint in the room room air filters load up much more rapidly than outdoor air filters Under normal conditions the room air filter requires replacement every six to eight weeks To ensure proper maintenance of the filters it is best to follow an organized maintenance procedure The following one is recommended Divide the total number of units on the job into s...