39
JOHNSON CONTROLS
FORM 201.21-NM4 (1020)
39
JOHNSON CONTROLS
5
General Operation
After completion of the above checks for System 1,
switch OFF the ‘SYS 1’ switch on the keypad and repeat
the process for each subsequent system. When all run
correctly, stop the unit, switch all applicable switches
to the ‘ON’ position and restart the unit.
Assure all checks are completed in the EQUIPMENT
START-UP CHECK SHEET (Pages 148 -153). The
chiller is then ready to be placed into operation.