Unit Instruction
7
TiO
2
YBAH Assembly
1-5-1 TiO2 assembly installation
The TiO2 YBAH assembly is installed in the air-inlet of the YBAH unit (The Figure shown as below), which
has been installed before ex- factory.
Component list of TiO2 YBAH Assembly
Model
TiO
2
model
Connection frame Qty
Connection flange dimension
Lamp input
power
(
W
)
P,mm
Q,mm
YBAH1F TiO
2
YBAH1F
1
710
320
3×18
YBAH02 TiO
2
YBAH02
1
795
320
3×18
YBAH2F TiO
2
YBAH2F
1
950
320
3×18
YBAH03 TiO
2
YBAH03
1
980
371
4×18
YBAH04 TiO
2
YBAH04
1
1120
411
4×18
YBAH05 TiO
2
YBAH05
1
1260
460
4×18
YBAH06 TiO
2
YBAH06
1
1460
460
6×18
YBAH07 TiO
2
YBAH07
1
1700
460
6×18
YBAH08 TiO
2
YBAH08
1
1910
460
9×18
YBAH10 TiO
2
YBAH10
1
1710
639
12×18
YBAH12 TiO
2
YBAH12
1
2010
639
12×18
YBAH15 TiO
2
YBAH15
1
2485
639
18×18
Notice: Ultraviolet Lamp Power 18W/Piece
Summary of Contents for YBAH Series
Page 24: ...Maintenance and Repairing 23...