![Yongmao STT113 Operation & Service Manual Download Page 20](http://html1.mh-extra.com/html/yongmao/stt113/stt113_operation-and-service-manual_912135020.webp)
STT113 TOWER CRANE OPERATION AND SERVICE MANUAL
3B
-
10
2). Machinery
Inspection item
Cycle
After each erection
Half a month
Metal
structure
Mast verticality and levelness
∨
∨
Visual inspection of gear ring bolt
∨
Tighten up of slewing gear ring
bolt
∨
∨
Visual inspection the fishplate
connection on standard mast, jib,
counter jib and fixing plate on
base plate, including pin, split pin
and bolt.
∨
∨
Detect the crack of section steel
and check the weld joint
∨
∨
Mechanical
parts
Adjust and
check the
brake with
max. load
Hoisting winch
∨
Slewing mechanism
∨
Trolleying winch
∨
Traveling
mechanism
∨
Check the
worn out of
the wearing
plate
Hoisting winch
∨
∨
Slewing mechanism
∨
∨
Trolleying winch
∨
∨
Traveling
mechanism
∨
∨
Check the
oil level of
reducer
Hoisting winch
∨
∨
Slewing mechanism
∨
∨
Trolleying winch
∨
∨