7. MAINTENANCE
7.1 Daily check
(1) Zero calibration and span calibration
1. Perform zero calibration. For the calibration procedures, refer to “Item 6.9.1 Zero calibration”.
2. Then, perform span calibration. For the calibration procedures, refer to “Item 6.9.2 Span
calibration”.
3. Zero calibration and span calibration should be carried out once a week, as required.
(2) Flow rate check
1. Sampling gas flow and purge gas flow are as follows:
• Sampling gas flow: 0.5 ± 0.2 L/min
• Purge gas flow: About 1 L/min
2. Check and maintenance should be carried out every day, as required.
7.2 Daily check and maintenance procedures
Table 7.1
Maintenance and check table
Parts to be checked
Phenomena
Causes
Remedy
Daily
check
Indication value
Indication values are
lower.
Indication values are
higher.
(1) Dust is mixed in
sampling cell
(1) Clean the sampling cell.
In addition, check sampling
devices, especially gas filter.
(2) Air is absorbed midway
in the sampling pipe.
(2) Find out cause of leak and
repair.
Purge gas flow is
included when purging
gas in sample gas flow
rate.
Standard flow is beyond
the specified flow rate of
0.5 L/min, 0.3 to 0.7 L/
min.
Adjust be needle valve of flow
rater.
W
eekly check
Zero point of gas
analyzer
It is deflected.
Adjust.
Span point of gas
analyzer
It is deflected.
Adjust.
Yearly check
Gas analyzer
Regardless of any
phenomena
Overhaul.
Summary of Contents for IR400 series
Page 1: ...User s Manual R Model IR400 Infrared Gas Analyzer IM 11G02N01 01E IM 11G02N01 01E 5th Edition ...
Page 7: ...Blank Page ...
Page 11: ...Blank Page ...
Page 33: ...Blank Page ...
Page 35: ...Blank Page ...
Page 83: ...Blank Page ...
Page 93: ...Blank Page ...
Page 97: ...Blank Page ...
Page 117: ...Blank Page ...