![YOKOGAWA DPharp Series User Manual Download Page 39](http://html1.mh-extra.com/html/yokogawa/dpharp-series/dpharp-series_user-manual_3611198039.webp)
<Appendix 1. Safety Instrumented Systems Installation>
A1-1
IM 01C25T03-01E
Appendix 1. Safety Instrumented Systems
Installation
When using the transmitters in a Safety Instrumented System application, refer to the Functional Safety
Manual (Document No.: TI 01C25A05-01EN or TI 01C25A05-21EN for option code SLT) and follow the
instructions and procedures described there.The document can be downloaded from the website of
Yokogawa.
(Website address:
https://www.yokogawa.com/solutions/products-platforms/field-instruments/
)
In order to satisfy the requirement of Safety Instrumented System, executing parameters setting is required.
Please refer to 3.2 “Setting Parameters Using the BT200” for setting range.
Please also refer to the status output setting in the same clause. After installing the transmitter, confirm that the
range and unit is set correctly. Calibration of the transmitters shall be done after completing the range setting.