background image

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS

5

6

X

2

B

X

2

C

X

2

D

X

2

E

X

104

V

X

16

1

X

1

X

M6

X

16

S4

3

S4

X

8

1

X

16

2

X

8

3

X

1

X

M6

X

16

M6

X

16 M6

X

35

S6

3

3

C

D

C

A

A

B

D

A

B

E

A

E

D

C

C

1

1

D

2

2

A

Use screws #1, #2 and #3 to connect poles and beams together as above.

2

x

 

12

 

 

1

D

E

x

 

12

x 12

E

x

 

 

14

x

 

 

14

D

B

C

x 14

x 14

D

1

C

B

x

 

12

B

Put 

24

 Hooks (V) to each slot of sidewall track (B and C ). Connect B and C into

one beam using screws #1.

Attention: All 

24

 Hooks (V) need to be installed, otherwise it will affect to zip up fully.

Put 

28

 Hooks (V) to each slot of sidewall track (D and E). Connect D and E into 

one beam using screws #1.

x2

x2

Attention: All 

28

 Hooks (V) need to be installed, otherwise it will affect to zip up fully.

Summary of Contents for FTPLCG-0001

Page 1: ...s about the installation of YITAHOME products just contact us at from Mon Fri AM PM PST Sat AM PM PST or e mail us at after sale cs hotmail com Alternative method to contact us amazon com orders only...

Page 2: ...ckets Metal Brackets Metal Brackets Finishing Bar Finishing Bar Finishing Bar Solidifying Bar Solidifying Bar Corner Solidifying Bars Stand Base Corner Cover Joint Cover 1 It required two or more peop...

Page 3: ...5X15 QTY ITEM DESCRTION O P Q R S T T1 T2 U U1 U2 V W W1 X 1 2 3 4 5 Roof Metal Sheet Inside Roof Connector Outside Roof Connector Finishing End Finishing End Roof Panels Roof Panels Roof Panels Roof...

Page 4: ...above 2 x 12 1 D E x 12 x 12 E x 14 x 14 D B C x 14 x 14 D 1 C B x 12 B Put 24 Hooks V to each slot of sidewall track B and C Connect B and C into one beam using screws 1 Attention All 24 Hooks V need...

Page 5: ...K K K 1 1 K K 1 1 J1 J1 J2 J2 J1 J2 J1 J2 X4 J1 X4 J2 X32 1 X1 X M6X16 S4 X4 K X16 1 X1 X M6X16 S4 Then a x the frame with corner solidifying bars K using screws 1 as above A x the frame with corner...

Page 6: ...as shown in diagram A x middle beams using joint cover N and screws 4 as shown in diagram 7 8 X4 F X1 P X4 1 X1 X X4 X4 1 O X1 X M6X16 M6X16 S4 S4 F 1 F P F F F F P 1 F F F F Connect the triangle roo...

Page 7: ...NS 11 12 9 X1 S4 G G 1 G G G G G 1 G P X6 X12 1 G X M6X16 Attach roof bar P to inside roof connector using screws 1 as above 10 X1 X1 X3 1 Q X M6X16 S4 Q P Q Connect outside roof connector Q to inside...

Page 8: ...T2 H1 T1 T T1 T2 H2 H1 H T1 G G G H1 T1 F F H1 T1 Cover metal brackets H H1 and H2 to roof panels T T1 and T2 as shown in diagram 12 U2 U1 U2 U U1 U1 U1 U2 U U2 U1 G G F F U1 U1 G X4 X2 U U1 X4 U2 Cov...

Page 9: ...R S I1 I R I2 S S I1 R I1 U1 G U I S A x nishing bars U U1 by R S using screws 1 to roof bar and corner roof bar as shown in diagram 14 X4 W X4 W1 W W1 W V W Hang up solid sidewall W1 and mosquito si...

Page 10: ...NS 16 Installation Completed Find the hole located on the curtain and fold vertically in line with the hole Place the post in line with the hole The larger side of the curtain should be installed on t...

Reviews: