background image

40 

2.3.4  Do not leave any things on the machine. 

 

2.3.5 

Don’t  use  any  materials  other  than  those  recommended  by  the  manufacturer  for  cutting  operations  on  the 

 

machine.

 

 

2.3.6  Ensure that the work piece is clamped appropriately by the machine's clamp or vice

 

 

2.3.7  Ensure safe working position, always keep your balance.

 

 

2.3.8  Keep your machine always clean for safe operation. Follow the instructions at maintenance and replacement of 

accessories.  Check  the  plug  and  cable  regularly.  If  damaged,  let  it  replace  by  a  qualified  electrician.  Keep 
handles and grips free of any oil and grease.

 

 

2.3.9  Unplug first, before conducting and maintenance works.

 

 

2.3.10  Ensure that any keys or adjustment tools have been removed before operating the machine..

 

 

2.3.11  If you are required to operate the machine outside, use only appropriate extension cables.

 

 

2.3.12  Repairs should be carried out by qualified technicians only. Otherwise, accidents may occur.

 

 

2.3.13  Before starting a new operation, check the appropriate function of protective devices and tools, ensure that they 
 

work properly. All conditions have to be fulfilled in order to ensure proper operation of your machine. Damaged 

 

protective parts and equipment have to be replaced or repaired properly (by the manufacturer or dealer).

 

 

2.3.14 

Don’t use machines with improper functioning buttons and switches

 

 

2.3.15 

Don’t keep flammable, combustive liquids and materials next to the machine and electric connections.

 

 

 

Summary of Contents for KD 350 M

Page 1: ...DELEN 34788 EKMEK Y STANBUL T RK YE TELEFON 0216 312 28 28 PBX TELEFAX 0216 484 42 88 MZA KA E R N N C NS AL M NYUM VE PVC KESME MAK NES MARKASI YILMAZ MODEL KODU KD 350 KD 400 M D P BANDROL SER NO TE...

Page 2: ...gesinin kullan lmas na 4077 say l T keticinin Korunmas Hakk nda kanun ve bu kanuna dayan larak 14 maddesi ile ilgili y netmelik h k mleri gere ince TC Sanayi ve Ticaret Bakanl T keticinin ve Rekabetin...

Page 3: ...V AC 3P PE 2 2 kW 50 Hz 230V AC P N PE 3000 dev dak RPM D 350 mm d 30 32 mm 6 8 BAR 7 Lt dak Lt min W 72 L 65 H 160 115 154 KD 400 M 2 2 kW 50 Hz 400V AC 3P PE 2 2 kW 50 Hz 230V AC P N PE 3000 dev dak...

Page 4: ...4...

Page 5: ...5...

Page 6: ...6 ELEKTR K EMASI WIRING DIAGRAM KD 350 400 3P...

Page 7: ...7 KD 350 400 1P...

Page 8: ...8 PN MAT K EMASI PNEUMATIC DIAGRAM KD 350 400 P...

Page 9: ...9 KD 350 400 PS...

Page 10: ...10 KESME D YAGRAMI CUTTING DIAGRAM KD 350 M D P...

Page 11: ...11 KD 400 M D P...

Page 12: ...12 BOYUTLAR DIMENSIONS...

Page 13: ...13 PAR A L STES PART LIST RES M FIGURE 1...

Page 14: ...14 RES M FIGURE 2...

Page 15: ...1 33 2TU012510 0363 KD 350 1 66 1PL010000 0053 1 33 2TU012510 0367 KD 400 1 66 1 1EL010000 0080 1 36 2TU011441 0098 KD 350 1 67 2TU011441 0305 1 36 2TU011441 0099 KD 400 1 71 1PN010000 0087 1 42 2TU0...

Page 16: ...70000 0007 KD 350 1 90 1SR070000 0006 KD 400 1 91 1SC071000 0005 1 95 1SC041000 0014 3 96 1SC131000 0006 2 97 1SC011000 0002 1 98 1SC0210000 0050 5 100 1SC011000 0036 4 107 2TU012610 0053 1 107 2TU012...

Page 17: ...Makinenin Kurulumu 5 1 Haz rl k 5 2 Makinenin g kayna na ba lanmas 6 Makine G venlik Bilgileri 7 Operasyon 7 1 Haz rl k 7 2 Operasyon 7 3 A l kesim yapma 8 Bak m Servis ve Onar m 8 1 Bak m 8 2 Kesici...

Page 18: ...r kullan c lar i in rehber te kil eder 1 2 Servis Bilgileri Herhangi bir problem oldu unda yard m i in istekleriniz veya yedek par a sipari leriniz i in l tfen yukar daki telefon faks veya e mail adre...

Page 19: ...www yilmazmachine com tr Makine hakk nda imalat veya makineyi ald n z bayi firma ile yap lacak her t rl yaz malarda a a daki bilgileri bildirmeniz yap lacak i lemleri asgariye indirmesi bak m ndan nem...

Page 20: ...l ma esnas nda ebeke ba lant kablosu hasar g recek olursa dokunmay n ve ebeke fi ini prizden ekiniz Y ksek s uyar s Testere de i tirme i leminde koruyucu eldivenleri kullan n Makine al t nda elinizi t...

Page 21: ...araf ndan tamamen yerine getirilmelidir retici firmadan al nan bir veya daha fazla makine par alar n n yedeklerinin yetki verilmeksizin kar t r lmas veya aksesuarlar n n kullan m n n b t n bu tavsiyel...

Page 22: ...eyi al t rmadan nce anahtar veya ayar aletlerinin kar lm oldu undan emin olun 2 3 11 A k havada al man z gerekirse sadece bu i i in m saade edilen uygun uzatma kablosu kullan n 2 3 12 Onar mlar sadece...

Page 23: ...uzu MKN 300 Konvey r Servis anahtar 8 mm Makine sehpas KD 350 400 M Servis anahtar 17 mm So utma sistemi KD 350 400 P 350 mm testere KD 350 400 mm testere KD 400 4 MAK NEN N TA INMASI VE NAKL 4 1 B t...

Page 24: ...M 1 NO 5 zerine resimde g r ld ekilde monte ediniz 5 1 5 artland r c RES M 1 NO 79 demonte ekilde sevk edilmektedir artland r c y ase RES M 1 NO 1 zerine resimde g r ld ekilde monte ediniz 5 1 6 Plast...

Page 25: ...VENL K B LG LER 6 1 Makineyi kald rmak yerle tirmek ve elektrik bak m al malar i in nitelikli ve yetkili personel kullan lmal d r 6 2 Rutin bak m al malar ile programl bak mlar yetkili ve kalifiye el...

Page 26: ...Makinenin t m y zeylerini apaklardan yongalardan ve yabanc malzemelerden temizleyin Zararl maddelerden korunmak i in g zl k kullan n 7 1 3 Bu makine demir ala m i ermeyen al minyum malzemeler ve sert...

Page 27: ...bitleyiniz 7 2 2 KD 350 400 M D modellerinde mengeneler manuel KD 350 400 P modellerinde pn matik olarak uygulanmaktad r Mengenelerin ileri geri ve a a yukar konumunu zel s kma par alar RES M 1 NO 77...

Page 28: ...idir 7 3 A l kesim yapma 7 3 1 G nye RES M 1 NO 25 zerindeki zel s kma vidas n RES M 2 NO 89 gev etiniz 7 3 2 Susta milini RES M 1 NO 23 susta yuvas ndan ekiniz Ayn anda di er elinizle plastik kol RES...

Page 29: ...kullanmadan nce do ru tak l p tak lmad n salg s z ve uygun yerinden tak ld n makineyi bo ta al t rarak kontrol ediniz Hasar g rm i levselli ini kaybetmi kesici tak mlar kullanmay n z 8 2 Kesici tak m...

Page 30: ...arda bilenmesi gerekir Kesilen i par as n n kesme sonunda apakl kmas veya testerenin zorlanmas durumlar nda ger ekle tirilir 8 2 11 Testere delik ap 32 mm dir Sizin kullanaca n z testerenin delik ap 3...

Page 31: ...12 mm anahtar yard m ile tutarak kay n gerginli ini ayarlay n z Uygun gerginli e ayarlad ktan sonra par ay b rakmadan bo ta kalan elinizle M16 somunu RES M 2 NO 91 s k n z 8 3 8 Motor ba lant c vatala...

Page 32: ...Hava bas nc belirtilen de erlerin alt na d erse pnomatik g ile al an aksamlar al maz 8 5 3 artland r c nitesi hava i erisinde bulunan suyu pn matik kompenentlere zarar vermemesi i in toplama kab i er...

Page 33: ...terenin di lerini kontrol edin k r k di olabilir Hata bulursan z testereyi de i tirin Testerenin kesme ilerlemesi ok h zl Kesme ilerlemesi el hareketini malzemeye g re fazla Daha yava kesim yap n Moto...

Page 34: ...t talep etmeksizin tamiri yap lacakt r 5 T keticinin onar m hakk n kullanmas na ra men r n n 5 1 T keticiye teslim edildi i tarihten itibaren belirlenen garanti s resi i inde kalmak kayd yla bir y l i...

Page 35: ...5 Installation of the Machine 5 1 Preparation 5 2 Connecting to Power Source 6 Machine s Safety Information 7 Operation 7 1 Preparation 7 2 Operation 7 3 Angular cutting 8 Maintenance Service and Rep...

Page 36: ...rawings and details contained in this manual constitute a guide for the operator 1 2 Service Information In case of any technical problem please contact your nearest YILMAZ dealer or YILMAZ head offic...

Page 37: ...ine com tr Web www yilmazmachine com tr For minimize the documantation It is wery necessary to mention below details at the agreements signed with suppliers and dealers of the purchased machines Machi...

Page 38: ...d be damaged during operation don t touch and unplug it Never use damaged power cables High temperature warning During saw blade change operations use protective gloves Keep your fingers clear of the...

Page 39: ...ts of this manual 2 2 5 All directives recommendations and general safety rules contained in this manual have to be observed fully The machine cannot be operated in any way for purposes other than tho...

Page 40: ...d maintenance works 2 3 10 Ensure that any keys or adjustment tools have been removed before operating the machine 2 3 11 If you are required to operate the machine outside use only appropriate extens...

Page 41: ...CCESSORIES User manual MKN 300 Conveyor Service wrench 8 mm MS Machine stand KD 350 400 M Service wrench 17 mm Cooling system KD 350 400 P 350 mm Saw blade KD 350 400 mm Saw blade KD 400 4 TRANSPORT O...

Page 42: ...mps as shown on the figure on the table FIGURE 1 NO 5 5 1 5 Conditioner unit FIGURE 1 NO 79 are sent as demounted Mount the clamps as shown on the figure on the chassis FIGURE 1 NO 1 5 1 6 Plastic han...

Page 43: ...tation directions of cutting tools are correct or not and if the rotation direction is wrong appropriate connection must be made 6 MACHINE S SAFETY INFORMATION 6 1 Lifting installation electric mainte...

Page 44: ...le Especially ensure that the holding grips and handles are clean and dry 7 1 2 Clean all surfaces of the machine from chip and foreign particles Use eye glasses for protection 7 1 3 This machine can...

Page 45: ...1 9 While making cutting on the machine be careful about clamps being out of the cutting area of the saw 7 2 Operation 7 2 1 Place PVC or aluminum profile that you are going to process on to the tabl...

Page 46: ...e cutting grip to its original position press the Stop button The saw blade will come to a full stop after continuing its idle rotation for a while 7 2 7 Remove the part by opening the clamps Don t op...

Page 47: ...e do not use materials that may damage the dye 8 1 4 Control cutting tools against corrosion distortion and fractions If cutting tools are damaged change them 8 1 5 Before using cutting tool operate t...

Page 48: ...2 9 Install the guard group parts applying the reverse order as described above 8 2 10 It is necessary to sharpen replace the saw blade in certain intervals depending on the cutting material If the cu...

Page 49: ...NO 59 to off position by turning it with the aid of a switch have the belt FIGURE 1 NO 90 got loosen by pushing the motor FIGURE 1 NO 60 forward 8 3 6 Change the new belt with the previous one Be care...

Page 50: ...Pull up pressure adjustment valve Set adjustment valve to the desired value on manometer by turning it clockwise or counter clockwise Then lock the valve by pressing it down 8 5 2 Set the air pressur...

Page 51: ...ade Check the saw blade teeth Replace if necessary Saw blade moves to quick The cutting speed is too high for the material Decrease the cutting speed Motor does not work Start button is pressed not wo...

Page 52: ...parts labor or any other charges 5 The customer can request the replacement of the machine or the return of the purchase price or discount in proportion with the fault if 5 1 The same defect occurs mo...

Page 53: ...53 1 1 1 1 2 2 2 1 2 2 2 3 3 4 5 5 1 5 2 6 7 7 1 7 2 7 3 8 8 1 8 2 8 3 8 4 8 5 9 10...

Page 54: ...54 1 1 1 1 2 YILMAZ 10...

Page 55: ...55 Turgut zal Bulvar No 173 Ta delen 34788 ekmek y STANBUL T RK YE Te 0216 312 28 28 Pbx 0216 484 42 88 service yilmazmachine com tr Web www yilmazmachine com tr...

Page 56: ...56 2 2 1...

Page 57: ...57 2 2 2 2 1 CE 2 2 2 2 2 3 2 2 4 2 2 5 2 3 2 3 1 2 3 2 2 3 3 2 3 4...

Page 58: ...58 2 3 5 2 3 6 2 3 7 2 3 8 2 3 9 2 3 10 2 3 11 2 3 12 2 3 13 2 3 14 2 3 15...

Page 59: ...59 3 15 0 22 5 0 30 0 45 0 90 0 KD 350 400 M KD 350 400 D KD 350 400 P MKN 300 8 mm MS KD 350 400 M 17 mm KD 350 400 P 350 mm KD 350 400 mm KD 400 4 4 1 4 2 4 3 4 4 4 5...

Page 60: ...60 5 5 1 5 1 1 5 1 2 50 5 1 3 1 NO 1 1 5 1 4 1 NO 75 88 1 NO 5 5 1 5 1 NO 79 1 NO 1 5 1 6 1 NO 64 2 NO 63 5 1 7 MKN 300 1 NO 86 1 NO 86 MKN 300 3 5 1 8 2 NO 68...

Page 61: ...61 5 2 5 2 1 5 2 2 5 2 3 5 2 4 230 50 400 50 5 2 5 B 5 2 6 6 6 1 6 2 6 3 6 4...

Page 62: ...62 6 5 6 6 6 7 7 7 1 7 1 1 7 1 2 7 1 3 7 1 4 2 NO 57 7 1 5 7 1 6...

Page 63: ...63 7 1 7 7 1 8 7 1 9...

Page 64: ...64 7 2 7 2 1 1 NO 5 1 NO 75 88 7 2 2 KD 350 400 M D KD 350 400 P 1 NO 77 78 1 NO 71 1 NO 1 7 2 3 2 NO 89 1 NO 25 7 2 4 1 NO 66 1 1 NO 66 7 2 5 7 2 6 H...

Page 65: ...65 7 3 7 3 1 2 NO 89 1 NO 25 7 3 2 1 NO 23 1 NO 33 1 NO 64 1 NO 17 1 NO 5 7 3 3 15 22 5 30 45 1 NO 23 2 NO 89 1 NO 25 7 3 4 8 8 1 8 1 1 8 1 2 8 1 3 8 1 4...

Page 66: ...66 8 1 5 8 2 8 2 1 8 2 2 2 NO 47 8 2 3 2 NO 96 2 NO 42 8 2 4 2 NO 95 8 2 5 M10 2 NO 97 17 2 NO 50 8 8 2 6 2 NO 51 2 NO 54 8 2 7 2 NO 57 8 2 8 8 2 9...

Page 67: ...67 8 2 10 8 2 11 32 30 8 2 12 8 2 13 DIN EN 847 1 8 2 14 8 3 8 3 1 8 3 2 2 NO 64 5 2 NO 98 5 2 NO 63 8 3 3 13 2 NO 100 8 3 4 2 NO 59 12 16 2 NO 91 24 8 3 5 1 NO 59 1 NO 60 2 NO 90...

Page 68: ...68 8 3 6 2 NO 61 62 8 3 7 12 2 NO 91 16 2 NO 91 8 3 8 2 NO 100 8 3 9 8 4 8 4 1 8 4 2 8 4 3 90 1 NO 23 1 NO 8 90...

Page 69: ...69 8 5 8 5 1 8 5 2 6 8 8 5 3 8 5 4 TELLUS C10 BP ENERGOL HLP 10 MOBIL DTE LIGHT PETROL OF S SPINDURA 10...

Page 70: ...70 9 6 8...

Page 71: ...71 10 1 2 2 3 30 15 4 5 5 1 5 2 5 3 6 7...

Reviews: