
144~154 Gobo 5 shaking
155~165 Gobo 6 shaking
166~176 Gobo 7 shaking
177~187 Gobo 8 shaking
188~199 Gobo 9 shaking
200~201 open
202~227 forward flow, fast to slow
228~229 stop
230~255 reverse flow, slow to fast
Caution!
There are no user serviceable parts inside the unit. Do not open the housing or attempt any
repairs yourself. If exceptional problem happen, please contact related after-sale department or
manufacturer.
Any damage that cased by violating this manual is out of insurance, our company will not take
the responsibility.
Section 2. Set Up
Installation
Controlling Board
Machine connection
Installation
This machine should be mounted through the screw holes of truss. Safety wire is a must to
fix fixture well. Make sure truss and safety wire have strong load capacity to bear 3 times
weight than fixture at least.
This machine should be installed by qualified technician.
Summary of Contents for YR-IP350
Page 1: ......
Page 2: ...Water proof 350W Beam Spot Wash 3IN1 Model YR IP350...