Quick Steps to Start Testing Yealink W80B
Step1: Confirm the locations where you want to install Yealink W80B.
In this step, you will need a floor plan to find a place where is easy to install the screw and avoid
metal walls. If you want accurately plan the location for many bases, we have deployment and
installation guide for your reference:
Yealink DECT IP Multi-Cell System Deployment Guide_V1.1.pdf
Step2: Install the bases to the location.
For more information about installation, please refer to our QSG below:
Yealink DECT IP Multi-Cell Base Station W80B Quick Start Guide_V83.30.pdf