background image

 

16 

 
 
 
 

 
 
 
 

YAZAKI AUTHORIZED SERVICE PROVIDER 

 

 

For information concerning service, operation 

or technical assistance, please contact your 

Yazaki Authorized Service Provider or the following: 

 

YAZAKI ENERGY SYSTEMS, INC. 

701 E PLANO PKWY, SUITE 305 

PLANO, TEXAS 

75074-6700 

Phone: 469-229-5443 

Fax: 469-229-5448 

Email: 

[email protected]

 

Web: 

http://www.yazakienergy.com

 

 
 
 

 

 
 

This symbol on the product’s name plate means it is listed by 

UNDERWRITERS LABORATORIES, INC. 

 
 
 
 

Yazaki reserves the right to discontinue, or change at any time, 

specifications or designs without notice and without incurring obligations. 

 
 
 
 
 
 

KUL-OM1-1A-1011 

 

Summary of Contents for CH-K30

Page 1: ...UCTIONS and properly maintained it can provide many years of trouble free operation CONTENTS GENERAL Page ABSORPTION PRINCIPLE 2 COOLING OPERATION 2 HEATING OPERATION 3 CONTROLS GENERAL INFORMATION 4...

Page 2: ...cooled and heat is normally rejected to a cooling tower though ground loop is also an option COOLING OPERATION High Temperature Generator HGE The gas burner heats a dilute lithium bromide solution in...

Page 3: ...nd semi concentrated solution flow into the primary separator in exactly the same manner as in the cooling cycle Low Temperature Generator LGE In Heat mode the changeover valve opens a path for the se...

Page 4: ...y also be supervised and controlled by external control systems to a limited degree when the necessary interconnections are installed Additional controls and interlocks can be explained by your ASP On...

Page 5: ...2 10 Rated 300vac F4 2 Fuji Model FGAO 2 Rated 250vac F11 F12 2 Fuji Model FGAO 2 Rated 250vac F31 F32 1 Fuji Model FGAO 2 Rated 250vac FB11 FB12 2 Fuji Model FGAO 2 Rated 250vac FB21 FB22 15 Nagasaw...

Page 6: ...on the I O Board to ON The leaving chilled water temperature can be adjusted using the TC potentiometer on the CPU Board The leaving chilled water set point can be set in a range of 40 1 F 4 5 C to 59...

Page 7: ...ress the alarm RESET button to restart the cooling or heating operation If Error Code 52 is amongst the codes being displayed it will also be necessary to press the RESET button on the burner controll...

Page 8: ...Gas Pressure Check Supply and Manifold Inhibitor Check If required For the K Series an inhibitor charge is needed every 3 years on average Palladium Cell Heater Check Flow Rate Check Solution Pump Rot...

Page 9: ...s vacuum section Just because the vacuum pump has stopped producing bubbles in the water bucket does NOT mean the vacuum level is adequate A digital vacuum gauge MUST be used in order to determine the...

Page 10: ...iller heater itself as well If doing so pressurize the unit to the same pressure as the circuits using nitrogen See the Service Manual for further details TROUBLESHOOTING SYMPTOM Chiller heater does n...

Page 11: ...iption Notes Reset Type FS Flow switch alarm Chilled hot water flow switch FS1 open but for less than 10 minutes After 10 minutes this changes automatically to error code 27 Auto 01 DCP power error Op...

Page 12: ...10 C or above 212 F 100 C Ignored for first 10 minutes of P2 operation Manual 36 CND sensor error CND sensor reads below 14 F 10 C or above 212 F 100 C Auto 40 Loss of cooling capacity LT temperature...

Page 13: ...13 Please send a copy of any maintenance data sheets to Yazaki Energy Systems Inc at the address FAX number and or email address listed on the last page of this document...

Page 14: ...Labor Charges for warranty service can be obtained by an authorized service provider upon written request to YESI 7 LIMITATION OF WARRANTY AND LIMITATION OF REMEDY CUSTOMER s remedies shall be limite...

Page 15: ......

Page 16: ...MS INC 701 E PLANO PKWY SUITE 305 PLANO TEXAS 75074 6700 Phone 469 229 5443 Fax 469 229 5448 Email yazaki yazakienergy com Web http www yazakienergy com This symbol on the product s name plate means i...

Reviews: