
YASKAWA
TOEP C730600 89B PROFINET Installation Manual
13
•
A Phillips screwdriver or slotted screwdriver (blade depth: 0.4 mm (0.02 in), width: 2.5
mm (0.1 in))
•
A pair of diagonal cutting pliers.
•
A small file or medium-grit sandpaper.
*1
Phillips screw sizes are different for different drive capacities. Prepare different
screwdrivers for different screw sizes.
4
Option Components
◆
Option
A - Connector (CN5)
B - Installation hole
C - LED (NS)
D - LED (MS)
E -
Option PCB
F -
Software number label
G - Ground terminal (FE) and
installation hole
H - Port 1 LED (10/100)
I -
Port 1 (RJ45)
J -
Port 1 LED (LINK/ACT)
K - Port 2 LED (10/100)
L -
Port 2 (RJ45)
M - Port 2 LED (LINK/ACT)
N - Option modular connector CN1
Figure 4.1 Option
*1
Refer to
for more information about the LEDs.
*2
Connect the included ground wire during installation. The ground wire is not necessary for installations on
GA700, GA800, CR700, and CH700 drives.
◆
Communication Modular Connector CN1 Port 1/Port 2
The communication modular connector CN1 on the option is a modular dual RJ45 female
connector designated port 1 and port 2. Port 1 and port 2 are the connection points for a
customer-supplied male Ethernet network communication cable.