3.5 Wiring the Power Supply to the SERVOPACK
3.5.3 Power ON Sequence
3-28
3.
Open the wire insertion hole on the terminal connector with the tool. There are the fol-
lowing two ways to open the insertion hole. Use either method.
4.
Insert the connector into the wire insertion hole. Then, remove the Spring Opener or flat-
blade screwdriver.
5.
Make all other connections in the same way.
6.
When you have completed wiring, attach the connectors to the SERVOPACK.
3.5.3
Power ON Sequence
Consider the following points when you design the power ON sequence.
•
The ALM (Servo Alarm) signal is output for up to five seconds when the control power supply
is turned ON. Take this into consideration when you design the power ON sequence, and
turn ON the main circuit power supply to the SERVOPACK when the ALM signal is OFF (alarm
cleared).
•
Design the power ON sequence so that main circuit power supply is turned OFF when an
ALM (Servo Alarm Output) signal is output.
•
Make sure that the power supply specifications of all parts are suitable for the input power
supply.
•
Allow at least 1 s after the power supply is turned OFF before you turn it ON again.
Using a Spring Opener
Using a Flat-blade Screwdriver
Open the insertion hole with the Spring Opener as
shown in the figure.
Firmly insert a flat-blade screwdriver into the
screwdriver insertion hole to open the wire inser-
tion hole.
S
pring Opener
Wire
Turn ON the control power supply and the main circuit power supply at the same time or turn ON
the control power supply before the main circuit power supply.
Turn OFF the main circuit power supply first, and then turn OFF the control power supply.
Up to 5.0
s
Control power
s
upply
Main circuit power
s
upply
ALM (
S
ervo Alarm)
s
ignal
/
S
_RDY (
S
ervo Ready)
s
ignal
S
ervo ON
Alarm cleared.
Alarm
ON
OFF
ON
OFF
ON
OFF
S
ervo ON
S
ervo OFF
Power ON
Motor power
s
tatu
s
Power
s
upplied.
Power not
s
upplied.
Important