
9
Cable Wiring
9.1
Disassembly and Reassembly of Internal Wiring Harness
9-9
HW1485471
HW1485471
5. Connector Base
• Refer to
table 9-5 “Internal Wiring Harness Parts Checklist (Connec-
fig. 9-5 “Disassembly and Reassembly of the Internal
Wiring Harness (Connector Base)”
.
1. Unscrew the cross head APS bolts
which are fixing the connector
base. Pull the connector base a little bit and disconnect the tube which
is connected to the back side of the grease inlet. Be careful not to leak
grease from the tube.
2. Pull out the connector base further, and unscrew the cross head APS
bolts
which are mounted on the connector base. Remove the
ground lead wire.
3. Cut off the cable tie
.
4. Unscrew the pan-head sems screws
which are mounted on the
connector base, and then remove the gasket
and connector of the
internal user I/O wiring harness.
5. Remove the connectors (5 places), except for CN4, connected to the
back side of the 1BC connector. The 1BC connectors are 1, 2, 3, 4, 5
and 6 from the top to the bottom.
6. Cut off the cable tie
and disconnect the tube
.
7. Unscrew the hexagon socket head cap screws
, and then remove
the saddle
and saddle
.
8. Cut off the connector sticking out from the connector base box, and
then pull out the internal wiring harness from the top of the S-head.
Table 9-5: Internal Wiring Harness Parts Checklist (Connector Base)
No.
Item
Qty.
Note
Cross head APS bolt M6 (length: 12
mm) *stainless*
10
Cross head APS bolt M6 (length: 12
mm) *stainless*
3
Cable tie T50R-HSW
1
Pan-head sems screw M4 (length: 16
mm) *stainless*
Nut M4 *stainless*
2
each
Gasket HW9481087-E
1
Cable tie T50R-HSW
1
Tube HW9406005-A
1
Hexagon socket head cap screw M6
(length: 12 mm)
Conical spring washer 2L-6
Washer M6 *stainless*
2
each
Tightening torque 10 N•m
Saddle CD-51
1
Saddle CD-42
1
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
98/134