You have finished shingling your roof. Proceed to capping the ridge.
FINISH
11
After shingles are installed over bend, nail down overlap using two roofing nails per tab.
Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or
less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife.
Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge.
Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
Using your shingle hooked blade carefully cut shingles along chalk line.
6
7
8
9
10
SHINGLES
continued...
s
If more than 5" to rain slot you must install another row of shingles.
(2) Nails per tab
5"
(12,7 cm)
or less.
5"
(12,7 cm) MAX.
Top of rain slot.
Cut Off.
CUT
Summary of Contents for STOCKTON 8' x 12'
Page 2: ...This page intentionally left blank...
Page 11: ......
Page 13: ......
Page 14: ...12...
Page 16: ...14...
Page 17: ......
Page 18: ...16...
Page 19: ......
Page 20: ...18...
Page 21: ......
Page 22: ...20...
Page 23: ......
Page 24: ...22...
Page 25: ......
Page 26: ...24...
Page 27: ......
Page 28: ...26...
Page 29: ......
Page 30: ...28...
Page 31: ......
Page 32: ...30...
Page 33: ......
Page 34: ...32...
Page 35: ......
Page 36: ...34...
Page 37: ......
Page 38: ...36...
Page 39: ......
Page 40: ...38...
Page 41: ......
Page 42: ...40...
Page 43: ...41...
Page 44: ...42...
Page 45: ......
Page 46: ...44...
Page 47: ......
Page 48: ...46...
Page 49: ......