background image

16

x40

2" (5,1 cm)

PARTS REQUIRED:

Place a 

48" x 72"

 panel on the wall frame, as shown. 

Locate the panel flush to the top plate. 

 

Use the gauge block to mark the 3/4" side measurement on the wall stud. 
Secure panel with (2) 2" nails in the corners 

(Fig. A).

2

Secure panel with 2" nails spaced 6" apart on edges and 12" apart inside panel. 

EXAMPLE WALL 

Ensure your wall is square by installing one panel and squaring frame.

Move to the opposite end. Using the long edge of the panel as a lever,  
move the panel side-to-side until you have a 3/4" measurement on the wall stud.  
Secure corner with (2) 2" nails 

(Fig. B)

.

3/4" Gauge 

Block

x1

3/8 x 48 x 72"

(1 x 121,9 x 182,9 cm)

For squareness maintain 3/4" and 1-1/2" 

measurement along panel edge.

BEGIN  HERE

3/4"

(1,9 cm)

6" 

(15,2 cm)

12" 

(30,5 cm)

3/4" GAUGE 

BLOCK

GAA

WALL PANEL INSTALLATION HINTS & EXAMPLES

BEGIN

1

Install all wall panels with the primed side facing up.

3/4"

(1,9 cm)

Fig. A

 3/4" 

(1,9 cm)

2 Nails

Fig. B

 3/4" 

(1,9 cm)

2 Nails

 Angle nail to draw panels

 

 tight at seams.

HINTS

Summary of Contents for RIDGEPOINTE

Page 1: ...M AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based...

Page 2: ...This page intentionally left blank...

Page 3: ...ERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recomm...

Page 4: ...lation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface vis...

Page 5: ...cm x1 19 32 x 3 1 2 x 65 1 4 2 5 x 8 9 x 165 7 cm LHC x2 3 8 x 5 3 16 x 71 1 4 1 x 13 2 x 181 cm x2 3 8 x 5 3 16 x 79 3 4 1 x 13 2 x 202 6 cm x2 2 x 6 x 3 5 8 5 1 x 15 2 x 9 2 cm LUA x2 2 x 6 x 5 1 4...

Page 6: ...16 x 23 7 8 x 96 1 1 x 60 6 x 243 8 cm x1 7 16 x 11 1 2 x 96 1 1 x 29 22 x 243 2 cm x2 7 16 x 11 1 2 x 23 7 8 1 1 x 29 22 x 60 6 cm x2 x11 7 1 4 x 18 1 4 18 4 x 46 4 cm OSB OR WOOD GRAIN x1 3 8 x 14 5...

Page 7: ...1 56 Metal Threshold 3 4 1 9 cm x18 Bagged seperately special coating x2 1 1 2 3 2 cm 1 1 4 3 2 cm x20 1 5 8 4 1 cm NOTE If you are using a nail gun nails may be used where screws are shown for quicke...

Page 8: ...is paintable 1 GALVANIZED ROOFING NAILS 3 Lbs For shingles PAINT FOR TRIM 2 Quarts Use 100 acrylic latex exterior paint This shed kit includes a complete wood floor system This shed kit does not inclu...

Page 9: ...gram below A treated 2 x 4 5 1 x 10 2 cm sill plate is required when installing your shed on concrete Hint Purchase full length treated lumber Use a high quality exterior grade caulk beneath all sill...

Page 10: ...FRAME BEGIN You will build two floor sections x40 Center on marks Arrange parts as shown on flat surface Measure and mark each dimension from end of boards Secure with 2 3 nails at each mark and 4 na...

Page 11: ...lat surface Measure and mark each dimension from end of boards Secure with 2 3 nails at each mark and 4 nails at seams PARTS REQUIRED Flush at ends NOTE Look for Stamp FLOOR FRAME HINT For easier nail...

Page 12: ...REQUIRED Flush Flush FLOOR FRAME x40 Fasten floor sections together as shown Secure with 3 nails 3 Your floor frame is now assembled Proceed to level and square frame FINISH 120 305 cm 141 358 1 cm St...

Page 13: ...roximately 185 1 8 470 2 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the fr...

Page 14: ...ing in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE Leveling higher than 16 not recommend...

Page 15: ...e is square The measurement will be approximately 187 7 16 298 cm Install 1 48 x 96 panel with the 48 edge and corner flush to the outside of the floor frame Fig A and 3 4 along the floor joist Use th...

Page 16: ...3 4 Gauge Block Secure panels using 2 nails spaced 6 apart on edges and 12 apart inside panel All panels should be flush 3 4 GAUGE BLOCK Grid lines up 23 7 8 x 45 23 7 8 x 96 Flush Flush Flush Flush F...

Page 17: ...or should be used as a level work surface for wall construction Organize your wall sections during sub assembly to avoid over handling of the walls HINT Ensure the floor frame is level after installin...

Page 18: ...aring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Ga...

Page 19: ...walls EAVE WALL FRAME PARTS REQUIRED HINT For easier nailing stand on frame x7 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM x32 3 7 6 cm 3 7 6 cm Nails x2 2 x 4 x 46 1 2 5 1 x 10 2 x 118 1 cm OP UN x2 2 x 4 x...

Page 20: ...all 1 48 x 72 panel flush to the top plate Use the gauge block for consistent measurement on the wall stud Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel 3 Install 2 4...

Page 21: ...cm PARTS REQUIRED x28 3 7 6 cm BEGIN 1 Arrange parts on edge on floor Measure and mark Secure with 2 3 nails at each mark x6 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 c...

Page 22: ...auge Block 3 4 Gauge Block BEGIN HERE 3 4 1 9 cm 6 15 2 cm 6 15 2 cm 12 30 5 cm 12 30 5 cm 3 1 2 8 9 cm 3 1 2 8 9 cm 2 Install 1 48 x 72 panel flush to the top plate Use the gauge block for consistent...

Page 23: ...4 x 68 5 1 x 10 2 x 172 7 cm UM x1 2 x 4 x 27 3 4 5 1 x 10 2 x 70 5 cm BXC x2 2 x 4 x 28 1 2 5 1 x 10 2 x 72 4 cm QR HINT For easier nailing stand on frame x1 2 x 4 x 85 1 4 5 x 10 2 x 216 5 cm CYA PA...

Page 24: ...9 cm 2 Install 2 19 7 8 x 72 panels flush to the top plate and flush along door studs Use the gauge block for consistent measurement on the wall stud Secure the panels with 2 nails spaced 6 apart on e...

Page 25: ...rews spaced evenly and screwed in at an angle 5 Fig B 3 7 6 cm x5 3 7 6 cm Screws at angle Front wall panel OY OY Flush to panel edge Flush Front Wall Panel UM OY Top Plate Fig A x1 OY 2 x 3 x 72 5 1...

Page 26: ...ls Center right side wall on the 144 365 8 cm floor dimension 3 7 6 cm Screws OO BEGIN 1 Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails to hit floor frame Fig A 2 Se...

Page 27: ...il to hit floor frame Fig C Secure panel to side wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your back wall is now installed FINISH 3 7 6 cm Nails 2 5 1 cm x23 1 1 2 3 8 c...

Page 28: ...oor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Secure side wall bottom plates to floor with 3 nails Fig C Secure top plates with 1 3 screw angled at the corner Fig D ENSURE PANEL C...

Page 29: ...de wall studs with 1 1 2 nails spaced 6 apart Secure wall bottom plates to floor with 3 nails Fig C ENSURE PANEL CORNERS ARE FLUSH Your front wall is now installed FINISH Remove temporary bracing 2 5...

Page 30: ...itional rafter assemblies Remove URB Secure gusset to rafters with 12 2 nails as shown SET ASIDE ONE RAFTER ASSEMBLY WITH ONLY ONE GUSSET ATTACHED 4 3 x132 2 5 1 cm Gusset Flush Flush Flush x2 3 7 6 c...

Page 31: ...anel Flush to outside panel 24 61 cm 24 61 cm 24 61 cm 24 61 cm 22 7 8 58 1 cm Rafter with 1 GUSSET facing inward Preassembled Preassembled 1 GUSSET 2 GUSSET MEASUREMENTS ARE TO CENTER OF RAFTER Measu...

Page 32: ...top plate flush to outside of panels Fig A Working inside secure TP with 5 3 screws as shown 2 1 BEGIN TP CENTER CENTER Flush to outside of panel Flush x5 3 7 6 cm x1 TP 2 x 4 x 96 5 1 x 10 2 x 243 8...

Page 33: ...pattern PARTS REQUIRED LOFT JOIST ASSEMBLY x24 3 7 6 cm x2 2 x 4 x 94 1 2 5 1 x 10 2 x 240 cm UN 2 x 4 x 24 5 1 x 10 2 x 61 cm RL x2 Arrange parts as shown on a flat surface Hold parts UN and RL flus...

Page 34: ...all top plates Center loft joist and measure 3 4 in from edges of top plate Fig A Secure loft joist to top plates and to rafter with 4 3 screws Your loft supports are now installed FINISH x4 3 7 6 cm...

Page 35: ...t to exceed 300 lbs evenly distributed across loft PARTS REQUIRED LOFT PANEL 2 5 1 cm 7 16 x 23 7 8 x 96 1 1 x 60 6 x 243 8 cm x1 x18 Place 7 16 x 23 7 8 x 96 loft panel onto loft supports centered fr...

Page 36: ...le panel on 2 FOB Secure with 1 1 2 nails spaced evenly 1 BEGIN 2 Install left and right gable panels flush to installed panel Secure with 1 1 2 nails spaced evenly Flush Flush FOB x2 on fat 1 1 2 3 8...

Page 37: ...Working inside secure gable unit with 2 3 screws screwed into each FOB at an angle Fig A 3 Measure 1 1 2 down from top plate and mark at each side as shown Set gable unit on loft deck Hold gable unit...

Page 38: ...anel on 2 EHV Secure with 1 1 2 nails spaced evenly 1 BEGIN 2 Install left and right gable panels flush to installed panel Secure with 1 1 2 nails spaced evenly Flush Flush EHV x2 on fat 1 1 2 3 8 cm...

Page 39: ...ong edges 2 3 4 1 BEGIN Fig A Flush Flush 2 1 2 6 3 cm Flip over gable ladder sub assembly and fasten HPP to 3 URB with 3 screws Fig B Assemble AYB to LUA with 2 3 screws Fig C Install L block between...

Page 40: ...mbly Secure with 1 5 8 screws spaced evenly Fig E 6 3 7 6 cm Fig E Flush Flush 1 5 8 4 1 cm Screws x2 Ladder Assemblies FINISH Your front gable unit is assembled x18 1 5 8 4 1 cm Primed side down HINT...

Page 41: ...2 3 screws screwed into each EHV at an angle Fig A 3 Measure 1 1 2 down from top plate and mark at each side as shown Set gable unit on front wall doubler Hold gable unit secure with 1 2 nail on each...

Page 42: ...cks are level Ensure the L blocks are in the correct position using a level as shown Secure L blocks with 2 3 screws as shown Fig A Fig B Fig B Fig A 3 7 6 cm Screw 3 7 6 cm Screw 3 7 6 cm Screw HINT...

Page 43: ...18 1 4 gable filler panel flush to installed gable panel Center the panel Secure with 4 1 1 2 nails into rafter and 1 1 1 2 nail into UVE Install front 7 1 4 x 18 1 4 gable filler panel flush to inst...

Page 44: ...Fig A Secure panels to frame with 1 1 4 screws spaced evenly x2 3 8 x 8 1 2 x 76 5 8 1 x 21 6 x 194 6 cm Center and fush at peak Fig A Flush to wall FRONT OVERHANG SOFFIT x28 1 1 4 3 2 cm 1 BEGIN FIN...

Page 45: ...of rafter Fig A Fasten with 2 1 1 4 screws as shown Repeat on opposite side of shed Install 46 3 4 soffit flush to 96 soffit and marks Fasten at each mark with 2 nails angled into the studs nail into...

Page 46: ...o install sof ts on opposite side Your eave soffit panels are installed FINISH 5 3 16 x 79 3 4 5 3 16 x 71 1 4 x2 3 8 x 5 3 16 x 71 1 4 1 x 13 2 x 181 cm x2 3 8 x 5 3 16 x 79 3 4 1 x 13 2 x 202 6 cm F...

Page 47: ...side to side until the top corner is flush to the peak Fig A and with a 3 4 measurement on the rafter Fig C Secure panel with 2 2 nails in the corners 2 Roof panels may cause serious injury until sec...

Page 48: ...1 4 x 48 and 1 31 3 4 x 48 roof panels flush to installed panel and flush at rafter peak Fig A Fig D Secure with 2 2 nails in the corners of each panel 4 Flush 2 Nails 2 Nails Fig F Flush Fig E Flush...

Page 49: ...23 1 4 x 36 5 16 Secure roof panels with 2 nails spaced 6 apart along edges and 12 inside panels 31 3 4 x 36 5 16 36 5 16 x 96 23 1 4 x 36 5 16 12 30 5 cm 6 15 2 cm Flush Flush FINISH Repeat process t...

Page 50: ...ffit caps 5 1 2 x 6 5 8 with primed side facing out and flush to gable trim Fasten soffit caps with 4 2 finish nails Your gable trim is installed Remove temporary roof ledger boards Repeat steps to in...

Page 51: ...erhang frame with 4 1 1 4 screws at each side x8 1 1 4 3 2 cm FRONT OVERHANG TRIM Flush Flush Fig A 1 1 4 3 2 cm Screws Your corner soffits are now installed FINISH x2 3 8 x 4 1 8 x 8 1 2 1 0 x 10 5 x...

Page 52: ...s flush to rafters and flush to roof panels Fig A Secure with 2 2 finish nails at each rafter and 4 2 finish nails at seam Repeat steps to install fascia on opposite side You have installed your eave...

Page 53: ...evel TM on 4th and 6th rafters from back wall Flush TM to roof panels HINT For best appearance install TM on rafter facing away from door Secure with 3 nails as shown Your collar ties are now installe...

Page 54: ...x 12 1 2 1 x 20 3 x 31 8 cm x12 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x12 PARTS REQUIRED AE x10 x2 2 5 1 cm Nails Flush Flush LEVEL LEVEL Corner Stud Left Shelf Bracket 2 5 1 cm Nails FLOOR BACK WALL 3...

Page 55: ...nails at each support and with 4 nails at seam 3 4 x56 2 5 1 cm 2 5 1 cm Nails Flush Flush Flush 2 5 1 cm Nails KP KP JS JS SHELVING FINISH Your shelves are now installed 96 243 8 cm 23 7 8 60 6 cm 7...

Page 56: ...ening at two locations Fig A Mark each measurement Scribe a line across door panel Mark center of window opening at top and bottom We recommend painting the doors and door edges edges before installin...

Page 57: ...OWS BACK SIDE OF LEFT DOOR 1 1 8 2 9 cm Flush window to line 1 1 8 2 9 cm LEFT DOOR Fig A Fig B Fig C 3 4 1 9 cm Screws You must caulk completely around window frame and all exposed door panel edges a...

Page 58: ...69 Door Stiffener 175 3 cm x2 1 1 4 3 2 cm Arrange parts as shown on flat surface 3 8 offset is to top Look for red right and green left on hinge board Attach temporary supports OO and GAA as shown T...

Page 59: ...ng your doors Screw hinge boards into wall supports and floor with 10 3 screws as shown Make sure screws go into framing and foor Fig C 4 3 7 6 cm Screws into the wall support and foor frame 3 7 6 cm...

Page 60: ...ishing nails 3 Install metal threshold Fig C BEGIN 1 Reinforce the door and install 2 upper horizontal door rails GPA Flush GPA to bottom of window opening Secure trim with 3 4 screws from behind door...

Page 61: ...1 9 cm along the edge of door Fig B Install OO flush tight to window flange Fig B 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS Secure with 7 2 screws through outside trim into OO Fig B Secure with 7...

Page 62: ...open position with bolt end 3 8 down from frame Bolt is open when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR Fig B Your spring b...

Page 63: ...FINISH 1 3 4 4 4 cm 35 3 4 90 cm RIGHT DOOR 1 3 4 4 4 cm TOP VIEW 1 4 Pre drill and 3 8 Drill through DOOR HARDWARE DECORATIVE HINGES x1 3 4 1 9 cm x12 x4 x2 PARTS REQUIRED 1 1 2 3 8 cm Keep drilled h...

Page 64: ...ws into 2x4 gable connectors as shown 2 Apply high quality exterior grade caulk behind frame near edge before installing to seal window x1 Gable Window 1 1 4 3 2 cm 1 1 4 3 2 cm Screws Caulk behind fr...

Page 65: ...window trim on window NOTE There will be a slight reveal inside window 3 x2 19 32 x 3 1 2 x 18 1 2 1 5 x 8 9 x 47 cm TNE x2 19 32 x 3 1 2 x 11 1 2 1 5 x 8 9 x 29 2 cm UAF 2 5 1 cm x10 2 5 1 cm Finish...

Page 66: ...RED GABLE WINDOW x10 3 4 1 9 cm 4 Your gable window is now installed Working inside secure trim with 10 3 4 screws Snip protruding finish nails Do not screw into window fange INSIDE OF SHED FINISH 3 4...

Page 67: ...back 70 1 2 corner trim flush under gable panel and flush along the face of side wall panel Secure with 2 finishing nails spaced evenly FINISH Your corner trim is now installed 67 916 on eave walls 2...

Page 68: ...de facing out flush to back side of gable fascia and flush at peak Secure to overhang frame with 8 2 screws as shown Your front gable decorative trim is installed Gable Cleat x1 19 32 x 2 1 2 x 27 9 1...

Page 69: ...67 BEGIN 1 FINISH Swing door open to locate eye Install hooks into endcap and into L block behind Fig A Your hook and eyes are installed 2 Hook Eye Fig A HOOK EYE PARTS REQUIRED x2 Hook Eye...

Page 70: ...ave Caulk behind vent flanges Your vents are now installed Secure with 1 2 screws x12 1 2 1 3 cm x2 VENTS 8 x 16 20 3 x 35 6 cm 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm Caulk 4 1 4 10 8 cm You can place y...

Page 71: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 72: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 73: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 74: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 75: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 76: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridg...

Page 77: ...t 3 8 NG 8 1 2 X 76 5 8 SOFFIT K 76100808000 2 Corner Soffit 3 8 NG X 4 1 8 X 8 1 2 K 08080402000 2 Side Wall Soffit A 3 8 NG 5 3 16 X 79 3 4 K 79120503000 2 Side Wall Soffit B 3 8 NG 5 3 16 X 71 1 4...

Page 78: ...siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solu...

Reviews: