![Yardistry 1902316 Installation And Operating Instructions Manual Download Page 1](http://html1.mh-extra.com/html/yardistry/1902316/1902316_installation-and-operating-instructions-manual_906579001.webp)
Step 9
Square Post to Trellis A and attach Long Gusset
2- 5/16 x 5 ¼ (5/16 flat, lock washer and T-nut)
Predrill 1 - 5/16 x3 ,1/4 shank hex lag screw (5/16 flat washer)
Show squaring unit should be 152¾ diagonally from post to post
3.6m x 3.6m (12’ x 12’) Pergola
Installation and Operating Instructions – YM12775
Revised 07-31-2020
Height: 2.59 m (8’ 6”)
(12’)
(12’)
3.658 m
3.658 m
IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY
Yardistry – North America
Toll Free Customer Support:
1.888.509.4382
www.yardistrystructures.com
Y40000-775P
ITM./ART. 1902316
Regular Hours: Mon - Fri, 8:30 am - 5:00
pm EST (excl. holidays)
(For extended hours see our website)
English and French Spoken
Summary of Contents for 1902316
Page 30: ......