background image

Rope 

Assembly

Step 1. 

Locate four 3/8” threaded rod assemblies and insert them in the 

end holes on the side 2x6’s.

Fasten these with a 3/8” washer and a 3/8” locking nut.

Step 2. 

Fasten the rope brackets to a secure mounting surface using 2” 

star head lags.

Step 3. 

Hang the bed on the ropes and adjust them until the bed is level.

Summary of Contents for Cedar Daybed

Page 1: ...866 210 9273 YARDCRAFT COM 271 S Shirk Road New Holland PA 17557 Cedar Daybed ASSEMBLY MANUAL...

Page 2: ...Floor Board 7 Railing Assembly 2 Ropes Optional 4 4x4 Posts Optional 4 Hardware Daybed Parts Parts List YardCraft 2023 V1 0 Shoot for the stars with YardCraft s Orion Vinyl Playset With two slides a...

Page 3: ...7 6 5 4 3 2 1 Hardware 3 8 x 7 Threaded Rod 2 Star Head Lag 2 1 2 Wood Screw 1 1 2 Wood Screw 3 8 Locking Nut 3 8 Washer...

Page 4: ...s to the 2x6 s using 2 1 2 wood screws through the pre drilled holes Step 4 Locate two 72 1 4 2x3 pieces and four 36 15 16 2x3 floor joists Arrange them as shown above using the floor joist markings o...

Page 5: ...oles Step 7 Place a 2x3 brace in each corner of the 2x3 inner frame Fasten these with 2 1 2 wood screws Step 8 Place the floorboards in postion and space them out evenly on the frame Notice how the tw...

Page 6: ...and insert them in the end holes on the side 2x6 s Fasten these with a 3 8 washer and a 3 8 locking nut Step 2 Fasten the rope brackets to a secure mounting surface using 2 star head lags Step 3 Hang...

Page 7: ...Legs Assembly Step 1 Place a 4x4 post at each corner of the bed frame with the notches facing out Step 2 Fasten 4x4 post using 2 1 2 wood screws through the 2x6 frame Finished Bed...

Page 8: ...Railing Assembly Step 1 The 2x6 frame pieces have holes drilled for the railings on all sides so the railings can be placed anywhere Step 2 Fasten the railings to the frame using 2 1 2 wood screws...

Reviews: