![Yantrika DWT 300 Instruction Manual Download Page 5](http://html.mh-extra.com/html/yantrika/dwt-300/dwt-300_instruction-manual_905690005.webp)
"Process Instruments and Calibrators"
2.1
2.2
2.3
2.4
2.5
Instruction Manual
Set Up
Place the tester on a strong and rigid table in the instrument room. Direct rays of the sun should be avoided.
The instrument should not be near a furnace or any other hot area. The environment should be clean, dust and
vibration free.
Clean the instrument with a soft cloth and remove protective tape wherever provided.Remove the piston
protectors and store them for future transportation use in the tool-box.
Install the following as shown in the illustration on the previous page.
a) Levelling screws
b) Screw pump handle rods.
c) Place the weight carrier on the LP Piston. Place the bell and carrier on HP Piston.
If Electrical Power Rotation is ordered with the tester, attach the motor assembly to the baseplate of thetester
by means of the bolts provided. Tighten well. Attach the motor driving belt to the piston in use.Attach the
power cable to the mains supply ( 220VAC).
Place a spirit level on the top of the weight carrier and adjust the levelling using the levelling screws.This needs
to be done at first installation and whenever the position of the machine is changed.