PERIODIC MAINTENANCE
48
YDG Operation Manual
Note: These procedures are considered normal maintenance and are performed at the owners expense.
Exhaust system
Check spark arrester for
clogging (if equipped)
Before
operation
Fuel
Check fuel tank level and
add fuel as necessary
Before
operation
Drain and clean fuel tank
Clean inlet fuel screen
Replace outlet fuel filter
Check for fuel leakage
Before
and after
operation
Hoses
Replace fuel system
hose(s)
or every 2
years
whicheve
r comes
first
Generator
Check brushes for wear
or damage
Check slip rings for wear
or damage
Check coils and
Automatic Voltage
Regulator (AVR) for
correct operation
Frame
Check main and sub
frames for damage
Check engine/frame
dampers for wear,
damage and tightness
Check all fasteners for
damage and tightness
: Check
: Replace
: Contact your authorized YANMAR industrial engine dealer or distributor for these maintenance services
System
Check item
Daily
Periodic maintenance interval
Every
50 hours
Every
200
hours
Every
400
hours
Every
1000
hours
Every
1500
hours
Every
2000
hours
Summary of Contents for YDG Series
Page 10: ...INTRODUCTION viii YDG Operation Manual This Page Intentionally Left Blank ...
Page 14: ...TABLE OF CONTENTS xii YDG Operation Manual This Page Intentionally Left Blank ...
Page 36: ...PRODUCT OVERVIEW 22 YDG Operation Manual This Page Intentionally Left Blank ...
Page 56: ...GENERATOR OPERATION 42 YDG Operation Manual This Page Intentionally Left Blank ...
Page 82: ...TROUBLESHOOTING 68 YDG Operation Manual This Page Intentionally Left Blank ...
Page 92: ...YIYDG EN0000 2021 10 YANMAR ITALY S p A http www yanmaritaly it ...