65
3
IMPORTANT:
Do not operate the engine without
coolant.
To fill the radiator system use fresh water
and anti-freeze fluid.
When the anti-freeze is mixed with water,
the anti-freeze mixing ratio must be less
than 50%.
Tighten the radiator cap properly. If the
cap is loosely or not properly fitted,
overheating of the engine can result due
to coolant fluid loss.
OTHER SERVICING
Cleaning the Track Frame Slide
Pipes
When the slide pipes of the track frame are
clogged or adhered with soil or sand, clean
the slide pipes in the following manner
according to need.
WARNING
To avoid the personal injury or
death:
Place the machine on even
ground when cleaning the track
frame slide pipes.
1.
First lift the machine off the ground using
the dozer blade and boom functions.
2.
Switch the track width change / dozer
select lever to the “Track width change”
position.
3.
Push the control lever forward, and
expand the track width to 49 in. (1240
mm).
4.
Remove soil and sand adhered to the
slide pipes, then put grease evenly
around the pipes. Make sure all 4 slide
pipes are greased.
5.
Retract and expand the track width
repeatedly for a few times by moving the
control lever, so that the grease is spread
adequately.
6.
Switch the track width change / dozer
select lever to the “Dozer” position.
7.
Place the machine down on the ground
carefully by moving the dozer blade and
the boom.
(1) Track frame slide pipes
approx. 0.71 US gal (2.7 L)
(Reserve tank:
approx. 0.16 US gal (0.6 L)
Coolant volumes
Summary of Contents for ACHILLES A18SE
Page 1: ...VERSION 07092023 POWER BY A18SE CRAWLER EXCAVATOROWNER S HANDBOOK...
Page 2: ...NOTE PAGE...
Page 9: ......
Page 16: ...7 6 DANGER WARNING AND CAUTION LABELS...
Page 17: ...8 1 Code No RC418 5753 2 2 Code No RA228 5762 1 3 Code No RD517 5795 2 Both sides...
Page 21: ......
Page 24: ...15 DESCRIPTION OF MACHINE PARTS...
Page 25: ...16 Instrument Panel Switches INSTRUMENT PANEL AND CONTROL ELEMENTS...
Page 26: ...17...
Page 28: ......
Page 29: ...20...
Page 30: ...21...
Page 31: ...22 OPERATION OF THE ENGINE...
Page 32: ...23...
Page 33: ...24...
Page 34: ...25...
Page 35: ...26...
Page 36: ...27...
Page 38: ...29 EXCAVATOR OPERATION...
Page 39: ...30...
Page 40: ...31...
Page 42: ...33...
Page 43: ...34...
Page 44: ...35...
Page 45: ...36...
Page 46: ...37...
Page 47: ...38...
Page 48: ...39...
Page 49: ...40...
Page 50: ...41...
Page 51: ...42...
Page 52: ...43...
Page 53: ...44...
Page 54: ...45...
Page 55: ...46...
Page 56: ...47...
Page 57: ...48...
Page 58: ...49...
Page 59: ...50...
Page 60: ...49...
Page 61: ...50...
Page 62: ...51...
Page 63: ...52...
Page 64: ...53...
Page 65: ...54...
Page 66: ...55...
Page 68: ......
Page 71: ...56...
Page 72: ...57...
Page 85: ...70...