Service - 88
SK1550 Operator’s Manual
Procedures
Track Tension
Check before startup and every 10 hours. Adjust as needed using one of the methods below, depending
on machine configuration.
Straightedge Adjustment
Check
1. Lift track.
2. Place straightedge across front track span
from idler to sprocket as shown.
3. Measure distance from top edge of top of
track to straightedge (A). Distance should be
0.5” (13mm).
Adjust
1. Lift track.
2. Adjust tension.
• To tighten, pump MPG into grease zerk (shown) until distance measures 0.5” (13mm).
• To loosen, remove zerk and drain all grease. Then follow tightening procedure.
3. Start engine.
4. Drive forward one machine length and check track tension.
Contents under pressure. Impact can cause death or
serious injury. Relieve pressure before opening.
To help avoid injury:
• Service track grease cylinder only while standing away from zerk.
• Cover connection with heavy cloth when relieving pressure in cylinder.
A
t53om055w20.eps
Summary of Contents for 3TNV86C
Page 1: ...SK1550 Yanmar 3TNV86C Operator s Manual CMW 053 2996 Issue 2 0 Original Instruction ...
Page 19: ...Safety Awareness 18 SK1550 Operator s Manual Machine Safety Alerts ...
Page 49: ...Controls 48 SK1550 Operator s Manual Operator Station ...
Page 55: ...Drive 54 SK1550 Operator s Manual Shut Down ...
Page 63: ...Transport 62 SK1550 Operator s Manual Retrieve ...
Page 91: ...Service 90 SK1550 Operator s Manual Procedures ...
Page 97: ...Specifications 96 SK1550 Operator s Manual Declaration of Conformity ...