2-22
CABLE ROUTING DIAGRAM
1.
Radiator hose 2
2.
Radiator breather hose
3.
Ignition coil
4.
Throttle cable (pull)
5.
Throttle cable (return)
6.
Engine stop switch lead
7.
Bracket (CDI unit)
8.
CDI unit
A.
Put a cover over the ignition coil.
B.
Pass the throttle cables through
the cable guide.
C.
Pass the throttle cable over the
radiator mounting boss. Cross
the throttle cable behind the ra-
diator.
D.
Pass the throttle cables on the
outside of the ignition coil.
E.
Insert the engine stop switch
lead into the CDI unit band.
Align the coupler lower end with
the band lower end.
F.
Fit the hole in the CDI unit band
over the CDI unit bracket.
C
A
B
B
A
C
Summary of Contents for yz250f 2012
Page 4: ......
Page 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE ...
Page 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA ...
Page 197: ......
Page 198: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...