1
2
3
4
5
6
7
8
9
10
ENGINE
..........................................................................................5-1
CYLINDER HEAD, CYLINDER AND PISTON
.................................................5-5
REMOVING THE CYLINDER HEAD..........................................................5-7
REMOVING THE PUSH ROD ....................................................................5-7
REMOVING THE PISTON..........................................................................5-7
CHECKING THE CYLINDER HEAD ..........................................................5-8
CHECKING THE CYLINDER AND PISTON...............................................5-8
COMBINATION OF PISTON AND CYLINDER ..........................................5-9
CHECKING THE PISTON RING ..............................................................5-10
CHECKING THE PISTON PIN .................................................................5-10
CHECKING THE SMALL END BEARING ................................................5-11
CHECKING THE POWER VALVE ...........................................................5-11
CHECKING THE POWER VALVE HOLE ON CYLINDER .......................5-11
ASSEMBLING THE POWER VALVE .......................................................5-11
INSTALLING THE PISTON AND CYLINDER ..........................................5-12
INSTALLING THE CYLINDER HEAD ......................................................5-14
...............................................................................................5-15
...............................................................................................5-18
REMOVING THE PRIMARY DRIVE GEAR .............................................5-20
REMOVING THE KICK SHAFT ASSEMBLY ...........................................5-20
CHECKING THE KICK GEAR AND KICK IDLE GEAR............................5-20
INSTALLING THE KICK SHAFT ASSEMBLY ..........................................5-20
INSTALLING THE KICK IDLE GEAR .......................................................5-21
INSTALLING THE PRIMARY DRIVE GEAR ............................................5-21
INSTALLING THE KICKSTARTER LEVER..............................................5-22
.........................................................................................5-23
Summary of Contents for YZ125X 2022
Page 5: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY ...
Page 8: ......
Page 10: ......
Page 38: ...MOTORCYCLE CARE AND STORAGE 1 26 ...
Page 54: ...CABLE ROUTING DIAGRAM 2 15 EAM20152 CABLE ROUTING DIAGRAM Frame and engine left side view ...
Page 56: ...CABLE ROUTING DIAGRAM 2 17 Frame and engine right side view ...
Page 58: ...CABLE ROUTING DIAGRAM 2 19 Handlebar front view 0 in 0 mm 0 mm 0 in ...
Page 60: ...CABLE ROUTING DIAGRAM 2 21 Rear brake right side view ...
Page 62: ...CABLE ROUTING DIAGRAM 2 23 ...
Page 90: ...ELECTRICAL SYSTEM 3 26 ...
Page 158: ...CHAIN DRIVE 4 66 ...
Page 202: ...CRANKSHAFT 5 42 seal lip 4 1 2 3 M ...
Page 226: ...CARBURETOR 7 11 ...
Page 231: ...ELECTRICAL COMPONENTS 8 4 EAM30289 CHECKING THE SWITCHES 1 1 Engine stop switch ...
Page 236: ...ELECTRICAL COMPONENTS 8 9 ...
Page 250: ...TROUBLESHOOTING 9 13 ...
Page 268: ......