SHIFT SHAFT
5-35
TIP
Apply the transmission oil on the roller and shift
shaft.
8. Install:
•
Shift pedal “1”
•
Shift pedal bolt “2”
TIP
Align the upper line “a” of the shift pedal with the
center “b” of the crankcase projection and rotate
the shift pedal counterclockwise until it first en-
gages. Then install the shift pedal.
Shift pedal bolt
12 N·m (1.2 kgf·m, 8.9 lb·ft)
T
R
.
.
Summary of Contents for YZ125X 2022
Page 5: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY ...
Page 8: ......
Page 10: ......
Page 38: ...MOTORCYCLE CARE AND STORAGE 1 26 ...
Page 54: ...CABLE ROUTING DIAGRAM 2 15 EAM20152 CABLE ROUTING DIAGRAM Frame and engine left side view ...
Page 56: ...CABLE ROUTING DIAGRAM 2 17 Frame and engine right side view ...
Page 58: ...CABLE ROUTING DIAGRAM 2 19 Handlebar front view 0 in 0 mm 0 mm 0 in ...
Page 60: ...CABLE ROUTING DIAGRAM 2 21 Rear brake right side view ...
Page 62: ...CABLE ROUTING DIAGRAM 2 23 ...
Page 90: ...ELECTRICAL SYSTEM 3 26 ...
Page 158: ...CHAIN DRIVE 4 66 ...
Page 202: ...CRANKSHAFT 5 42 seal lip 4 1 2 3 M ...
Page 226: ...CARBURETOR 7 11 ...
Page 231: ...ELECTRICAL COMPONENTS 8 4 EAM30289 CHECKING THE SWITCHES 1 1 Engine stop switch ...
Page 236: ...ELECTRICAL COMPONENTS 8 9 ...
Page 250: ...TROUBLESHOOTING 9 13 ...
Page 268: ......