FRONT BRAKE
4-19
3. Install:
• Spring “1”
Install to the brake master cylinder piston
“2”.
TIP
Install the spring with a smaller inside diameter
to the brake master cylinder piston.
4. Install:
• Brake master cylinder kit “1”
• Washer “2”
• Circlip “3”
• Dust boot “4”
• Push rod “5”
TIP
• Before installation, apply brake fluid to the
brake master cylinder kit.
• Before installation, apply silicone grease to
the push rod end.
• Use circlip pliers to install the circlip.
EASB29B152
INSTALLING THE FRONT BRAKE MASTER
CYLINDER
1. Install:
• Brake master cylinder “1”
TIP
• Install the front brake master cylinder holder
with the “UP” mark facing up.
• First, tighten the upper bolt, then the lower
bolt.
2. Install:
• Copper washers
• Brake hose
• Union bolt
EWA
WARNING
Proper brake hose routing is essential to in-
sure safe vehicle operation.
ECA
NOTICE
During installation, bring the brake hose
into contact with the brake master cylinder
projection “a” and make its bent portion “b”
face downward.
1
2
3
2
1
3
New
New
Brake master cylinder holder bolt
9 N·m (0.9 kgf·m, 6.6 lb·ft)
Brake hose union bolt
30 N·m (3.0 kgf·m, 22 lb·ft)
T
R
.
.
1
New
T
R
.
.
Summary of Contents for YZ 2018 Series
Page 6: ...EASB916006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 40: ...MOTORCYCLE CARE AND STORAGE 1 28...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...CABLE ROUTING DIAGRAM 2 29 EASB29B065 CABLE ROUTING DIAGRAM...
Page 72: ...CABLE ROUTING DIAGRAM 2 31...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 255: ...OIL PUMP AND BALANCER GEAR 5 58 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 276: ...TRANSMISSION 5 79...
Page 290: ...FUEL TANK 7 5 A Left B Right 1 1 A 0 mm 0 in B 1 1 15 mm 0 59 in...
Page 296: ...THROTTLE BODY 7 11...
Page 299: ......
Page 313: ...CHARGING SYSTEM 8 14...
Page 321: ...COOLING SYSTEM For JPN 8 22...
Page 351: ...FUEL PUMP SYSTEM 8 52 EASB29B345...
Page 352: ...ELECTRICAL COMPONENTS 8 53 ELECTRICAL COMPONENTS EASB29B346 9 10 11 1 3 2 4 5 6 7 8...
Page 354: ...ELECTRICAL COMPONENTS 8 55 11 10 9 2 3 1 6 7 8 4 5...
Page 356: ...ELECTRICAL COMPONENTS 8 57 EASB29B347 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...
Page 372: ...ELECTRICAL COMPONENTS 8 73 c Measure the fuel injector resistance...