– 6 –
SPEC
CABLE ROUTING
1
Clutch cable
2
Parking brake cable
3
Starter cable
4
Front brake hose
5
Front brake light switch lead
6
Engine stop switch lead
7
Throttle cable
8
Clutch switch lead
9
Handlebar switch lead
0
Meter assembly lead
È
Fasten the clutch switch lead and handlebar
switch lead with plastic bands.
É
Fasten the engine stop switch lead and front
brake light switch lead with plastic bands.
Ê
53 ~ 54 mm (2.09 ~ 2.13 in)
Ë
88 ~ 89 mm (3.46 ~ 3.50 in)
Ì
Route the meter assembly lead along the han-
dlebar, and then pass it to the front of the lower
section of the handlebar.
12 3
8
6
4
5
0
È
É
7
9
Ê
Ë
Ì
Summary of Contents for YFM350R-W
Page 1: ...YFM350R W N0A1 AE1 SUPPLEMENTARY SERVICE MANUAL ...
Page 71: ......