Perio
d
ic maintenance an
d
a
d
justment
6-15
6
11. Install the coolant reservoir and its
cover by placing them in the origi-
nal position, and then installing the
bolts.
12. Pour the specified amount of the
recommended coolant into the ra-
diator and reservoir.
13. Install the radiator cap.
14. Install the coolant reservoir cap.
15. Start the engine, let it idle for sev-
eral minutes, and then turn it off.
16. Remove the radiator cap to check
the coolant level in the radiator. If
necessary, add sufficient coolant
until it reaches the top of the radi-
ator, and then install the radiator
cap, radiator cap retainer and ra-
diator cap retaining bolt.
17. Check the coolant level in the res-
ervoir. If necessary, remove the
coolant reservoir cap, add coolant
to the maximum level mark, and
then install the cap.
18. Route the coolant reservoir
breather hose through the guide
as shown.
19. Start the engine, and then check
the vehicle for coolant leakage. If
coolant is leaking, have a Yamaha
dealer check the cooling system.
20. Install the cowling and the panel.
Antifreeze/water mixture ratio:
1:1
Recommen
d
e
d
antifreeze:
High-quality ethylene glycol anti-
freeze containing corrosion inhibi-
tors for aluminum engines
Coolant quantity:
Radiator (including all routes):
2.00 L (2.11 US qt, 1.76 Imp.qt)
Coolant reservoir (up to the maxi-
mum level mark):
0.25 L (0.26 US qt, 0.22 Imp.qt)
1. Radiator cap
2. Radiator cap retaining bolt
3. Radiator cap retainer
2
1
3
1. Coolant reservoir breather hose
2. Guide
2
1
UB61E1E0.book Page 15 Wednesday, October 21, 2015 11:19 AM