– 6 –
E
HANDLEBAR INSTALLATION
EXPLODED DIAGRAM
INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
HANDLEBAR INSTALLATION
Follow “Step” order for installation.
1
Upper handlebar holder
2
NOTE:
The upper handlebar holder should be installed
with the punched mark
a
forward.
2
Bolt 8
×
48 mm (0.31
×
1.89 in)
4
NOTE:
Tighten the bolts so that the front clearance
b
of the upper handlebar holder is smaller than
the rear clearance
c
.
Reference clearance:
b
: 1.5 mm (0.06 in)
c
: 3.5 mm (0.14 in)
3
Handlebar switch lead
1
NOTE:
Be sure to leave some slack in the handlebar
switch lead in the area
e
shown in the illustra-
tion.
Summary of Contents for WaveRunner VX110 Sport
Page 25: ......
Page 26: ...YAMAHA MOTOR CORPORATION USA Printed in USA Nov 2004 0 0 1 CR E ...