– 5 –
E
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
4
Throttle cable
1
5
Corrugated tube
1
6
Handlebar switch
1
7
Screw
5
×
25 mm (0.20
×
0.98 in)
2
NOTE:
Align the handlebar switch projection with the
hole on the handlebar.
1
2
3
4
5
3
3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
5
3
5
6
6
7
3.4 N • m (0.34 kgf • m, 2.5 ft • Ib)
Summary of Contents for WaveRunner VX110 Deluxe
Page 25: ......
Page 26: ...YAMAHA MOTOR CORPORATION USA Printed in USA Nov 2004 0 0 1 CR E ...