
– 3 –
E
WIRE LEAD AND CABLE ROUTING
EXPLODED DIAGRAM
INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
WIRE LEAD AND CABLE
ROUTING
Follow “Step” order for installation.
NOTE:
Working from the bow side, open the front
hood, and then remove the storage com-
partment.
1
Choke cable
1
2
Throttle cable
1
3
Handlebar switch lead
1
4
Grommet
1
NOTE:
Apply soapy water to the grommet for eas-
ier installation.
5
QSTS cable
2