PERIODIC MAINTENANCE AND MINOR REPAIR
7-8
7
To install the cowling
Place the cowling in the original posi-
tion, and then install the screws and the
quick fastener.
NOTE:
_
●
Make sure that the projection fits
into the grommet.
●
To install the quick fastener, push
the center pin out so that it will pro-
trude from the fastener head, in-
sert the fastener into the cowling,
and then push the protruding pin in
until it is flush with the fastener
head.
_
EAU03634
Cowling B
To remove the cowling
1. Remove cowling A.
2. Remove the screws, and then pull
the cowling off as shown.
1. Screw
1. Grommet
2. Projection
3. Cowling A
1. Cowling B
2. Screw (
×
2)
Summary of Contents for Venture XVZ13TF
Page 1: ...XVZ13TF OWNER S MANUAL ...
Page 2: ......
Page 17: ...DESCRIPTION 2 Left view 2 1 Right view 2 2 Controls and instruments 2 3 ...
Page 69: ...PRE OPERATION CHECKS 5 Pre operation check list 5 1 ...
Page 123: ...CLEANING AND STORAGE 8 Cleaning 8 1 Storage 8 3 ...
Page 128: ...SPECIFICATIONS 9 Specifications 9 1 ...
Page 141: ...CONSUMER INFORMATION 10 8 10 ...
Page 142: ...CONSUMER INFORMATION 10 9 10 ...