Periodic maintenance and adjustment
47
To install the top cover
Insert the projections on the front of the top
cover into the slots in the left and right upper
covers, and then fit the projections on the
rear of the top cover into the grommets.
Right upper cover (PZ5NX)
To remove the right upper cover
1.
Remove the top cover. (See the above
procedure.)
2.
Remove the right upper cover by remov-
ing bolts A and bolt B.
To install the right upper cover
1.
Place the right upper cover in the original
position, and then install and tighten
bolts A and bolt B to their specified
torques.
2.
Install the top cover.
Left and right upper covers (PZ5NT)
To remove an upper cover
1.
Open the shroud. (See the above proce-
dure.)
2.
Loosen the fasteners, and then remove
the upper cover.
To install an upper cover
1.
Insert the projections on the upper cover
into the slots, fit the holders on the cover
onto the grommets, and then tighten the
fasteners.
1. Top cover
1. Right upper cover bolt A
2. Right upper cover bolt B
3. Right upper cover
2
3
Tightening torques:
Right upper cover bolt A:
8 N·m (0.8 kgf·m, 5.9 lb·ft)
Right upper cover bolt B:
3.0 N·m (0.30 kgf·m, 2.2 lb·ft)
1. Fastener
2. Left upper cover
1. Projection
2. Holder
U8GK7AE0.book Page 47 Thursday, June 1, 2017 1:57 PM
Downloaded from