8-9
ESU04830
Adjusting the engine idling speed
CAUTION:
@
●
Be sure to have a Yamaha dealer make this
adjustment.
●
Make sure that the throttle lever moves smoothly.
@
1. Remove the shroud, the left and right side covers,
and the top cover. (See pages 8-5–8-7 for removal
procedures.)
2. Start the engine and warm it up.
3. Remove the headlight unit bolts
1
, and then lift up
the headlight unit.
4. Turn the idle adjusting screw
2
in or out to adjust the
engine idling speed.
5. Install the headlight unit, making sure to insert the
tabs on the headlight unit stay into the slots on the
bottom of the headlight unit.
6. Install the headlight unit bolts, and then tighten them
to the specified torque.
7. Install the top cover, the left and right side covers,
and the shroud.
Standard engine idling speed: 1,500
±
100 r/min
Headlight unit bolt tightening torque:
3 Nm (0.3 m·kgf, 2.2 ft·lb)
E_8gd.book Page 9 Wednesday, April 26, 2006 11:02 AM
Summary of Contents for RX10GTW
Page 1: ...OWNER S MANUAL SNOWMOBILE RX10GTW ...
Page 2: ......
Page 11: ...1 4 ESU04280 YAMAHA EXTENDED SERVICE Y E S CW 06E ...
Page 17: ...4 1 ESU00012 4 DESCRIPTION RX10GT RXW10GT ...
Page 100: ... MEMO ...
Page 101: ......
Page 102: ......