1
2
3
4
5
6
7
8
9
10
11
9-2
MULTI-PASSENGER
STORAGE
ENGINE PREPARATION
With the key removed and the spark
plug lead disconnected, turn the
clutch by hand until compression is
felt. This puts the valves in the closed
position.
CHASSIS
PREPARATION
1. Increase the tire pressure to 23 psi
(160 kPa, 1.6 kgf/cm2).
2. Clean exterior of the vehicle and
apply a rust inhibitor.
3. Cover the vehicle with a breath-
able cover and store it in a dry,
well-ventilated area.
BATTERY
PREPARATION
1. Remove the battery from the vehi-
cle and store it in a cool, dry place
that stays between 32°F (0°C) and
90°F (30°C).
2. Have the battery recharged every
60-90 days to keep it fully
charged. The battery must be kept
fully charged to avoid damage.
Batteries like the one supplied with
your vehicle normally do not require
you to check the water level inside the
battery for the one year warranty
period provided by the manufacturer.
NOTE
:
G20a O_M 9/19/00 1:22 PM Page 9-2