MIDDLE GEAR
5-94
• After tightening the middle driven shaft bearing
housing bolts, loosen them until the clearance
between the crankcase and the housing is ap-
proximately 2 mm (0.08 in), when measured
with a thickness gauge “1”.
4. Hold the middle drive shaft.
5. Turn:
• Middle driven shaft
NOTE:
While carefully tightening the middle driven shaft
bearing housing bolts in stages and in a criss-
cross pattern, turn the middle driven shaft back
and forth until the dial gauge reads 0.10–0.20
mm (0.0039–0.0079 in).
6. Measure:
• Crankcase-to-middle-driven-shaft-bearing-
housing clearance
(with a thickness gauge)
7. Select:
• Middle driven pinion gear shim(s) “1”
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Shims can only be selected in 0.05 mm incre-
ments, therefore round off to the hundredth’s
digit of the calculated thickness and select
the appropriate shims with the following
chart.
b. For example, the clearance between the
crankcase and the middle driven shaft bear-
ing housing is 0.42 mm. Therefore, the chart
instructs you to round off the 2 to 0. Thus, you
should use one 0.40 mm shim.
Shims are supplied in the following thickness-
es.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
8. Loosen:
• Middle driven shaft bearing housing bolts
9. Install:
• Middle driven pinion gear shim(s)
10.Tighten:
• Middle driven shaft bearing housing bolts
11.Measure:
• Middle gear backlash
Out of specification
→
Refer to “MEASUR-
ING THE MIDDLE GEAR BACKLASH” on
page 5-93.
EAS25930
ALIGNING THE MIDDLE GEAR
NOTE:
Aligning the middle gear is necessary when any
of the following parts are replaced:
• Crankcase
• Middle drive shaft
• Middle driven shaft bearing housing
1. Select:
• Middle drive pinion gear shim(s) “1”
• Middle driven pinion gear shim(s) “2”
NOTE:
Select the middle driven gear shim(s) “2” by cal-
culating the middle drive gear shim thickness
and then measuring the middle gear backlash.
Hundredth
Rounded value
0, 1, 2
0
3, 4, 5, 6, 7
5
8, 9
10
Middle driven pinion gear shim
Thickness (mm)
0.10 0.15 0.20 0.30 0.40 0.50
T
R
.
.
Middle driven shaft bearing hous-
ing bolt
25 Nm (2.5 m·kg, 18 ft·lb)
LOCTITE
®
Summary of Contents for FJR1300AS(X)
Page 1: ...2008 SERVICE MANUAL FJR1300A X FJR1300AS X 3P6 28197 E2...
Page 6: ......
Page 8: ......
Page 50: ...SPECIAL TOOLS 1 41...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4...
Page 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 3 2...
Page 85: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Main axle 2 Drive axle 3 Oil delivery pipe 1...
Page 86: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 6 5 4 3 2 1...
Page 88: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 2 3 4 5 6 7 8 9...
Page 90: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 4 5 3 2 1 9 8 6 7...
Page 94: ...COOLING SYSTEM DIAGRAMS 2 43 A A 7 1 2 3 4 5 5 7 8 6 8 9 10 11 12...
Page 100: ...CABLE ROUTING FJR1300A 2 49 2 3 4 5 6 7 8 9 11 10 12 13 14 15 16 A B C D E F 1 1...
Page 102: ...CABLE ROUTING FJR1300A 2 51 1 2 3 4 5 6 7 8 A B C D E 9 10 11 12 13...
Page 110: ...CABLE ROUTING FJR1300A 2 59 1 2 3 4 A B B C D E...
Page 120: ...CABLE ROUTING FJR1300AS 2 69 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 A B C E D F 1 1 H 10 18 G...
Page 122: ...CABLE ROUTING FJR1300AS 2 71 1 2 3 4 5 6 7 8 A B C D E 9 10 11 12 13...
Page 130: ...CABLE ROUTING FJR1300AS 2 79 1 4 2 5 6 A B C D D E 3 F G...
Page 136: ...CABLE ROUTING FJR1300AS 2 85...
Page 139: ......
Page 198: ...GENERAL CHASSIS 4 11 b a 1 2...
Page 326: ...CAMSHAFTS 5 21...
Page 420: ...CONNECTING RODS AND PISTONS 5 115...
Page 458: ...WATER PUMP 6 15...
Page 468: ...AIR INDUCTION SYSTEM 7 9 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 1 1 1 2 2 5 2 3 3 4 7 8 6...
Page 477: ......
Page 489: ...IGNITION SYSTEM 8 12...
Page 505: ...ELECTRIC STARTING SYSTEM 8 28...
Page 507: ...CHARGING SYSTEM 8 30 2 Rectifier regulator 3 AC magneto 8 Main fuse 9 Battery...
Page 509: ...CHARGING SYSTEM 8 32...
Page 533: ...COOLING SYSTEM 8 56...
Page 581: ...FUEL PUMP SYSTEM 8 104...
Page 593: ...ACCESSORY BOX SYSTEM 8 116...
Page 604: ...IMMOBILIZER SYSTEM 8 127 a Light on b Light off...
Page 605: ...IMMOBILIZER SYSTEM 8 128...
Page 615: ...ABS ANTI LOCK BRAKE SYSTEM 8 138...
Page 704: ...ELECTRICAL COMPONENTS 8 227 FJR1300A 5 1 3 2 17 8 10 11 12 13 14 15 16 7 6 4 9...
Page 706: ...ELECTRICAL COMPONENTS 8 229 FJR1300AS 13 16 18 17 2 3 4 5 6 7 8 1 9 10 11 12 15 14 19...
Page 708: ...ELECTRICAL COMPONENTS 8 231 FJR1300AS 1 19 3 2 5 7 9 8 12 13 14 15 16 11 10 18 17 6 4...
Page 736: ...ELECTRICAL COMPONENTS 8 259...
Page 745: ......
Page 746: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...