3-4
E
EMU00224
BREAKING IN (RUNNING IN)
ENGINE
Your new engine requires a period of
break-in (running-in) to allow mating sur-
faces of moving parts to wear-in evenly.
Correct break-in (running-in) will help
ensure proper performance and longer
engine life.
c
C
Failure to follow the break-in (running-in)
procedure may result in reduced engine
life or even severe engine damage.
EMU00233
Run the engine under load (in gear with a
propeller installed) as follows.
1)
For the first hour of operation:
Run the engine at 2,000 r/min or at
approximately half throttle.
2)
For the second hour of operation:
Run the engine at 3,000 r/min or at
approximately three-quarter throttle,
and during this period run it at full
throttle for approximately one minute
every ten minutes.
3)
For the next eight hours of operation:
Avoid continuous operation at full
throttle for more than five minutes at
a time.
4)
After these first 10 hours:
Operate the engine normally.
Break-in (running-in) time: 10 hours
67C-9-13-3 3/25/02 1:10 PM Page 5
Summary of Contents for F30B
Page 1: ...F30B F40B OWNER S MANUAL U S A Edition LIT 18626 05 07 ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 24: ...E MEMO ...
Page 42: ...E MEMO ...
Page 68: ...E MEMO ...
Page 80: ...4 11 E EMU00366 GREASING Yamaha marine grease Water resistant grease 103211 ...
Page 100: ...E MEMO ...
Page 111: ...EMU00450 Chapter 6 INDEX INDEX 6 1 1 2 3 4 5 6 E ...
Page 120: ......
Page 121: ......
Page 124: ...PLACE POSTAGE HERE ATTN WARRANTY DEPARTMENT Warranty card 2 27 02 11 47 AM Page 2 ...