9-28
PTT unit
f.
Connect the battery jumper leads to the
PTT motor lead “1” to fully retract the trim
and tilt ram.
TIP:
If the trim and tilt ram does not move down eas-
ily, push on the trim and tilt ram to assist oper-
ation.
g.
Reverse the connection between the bat-
tery jumper leads and the PTT motor lead
“1” to fully extend the trim and tilt ram.
TIP:
If the trim and tilt ram does not move up easily,
pull on the trim and tilt ram to assist operation.
h.
Repeat steps f and g to fully extend and re-
tract the trim and tilt ram 4 or 5 times.
i.
Fully extend the trim and tilt ram.
j.
Remove the reservoir cap, and then check
the fluid level.
TIP:
If the fluid is below the proper level, add the
recommended PTT fluid. Repeat steps c–i until
the fluid is at the proper level.
k.
Install a new O-ring and the reservoir cap,
and then tighten the reservoir cap to the
specified torque.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Installing the PTT unit
1.
Install:
• Bushing (to the PTT unit, clamp bracket,
and swivel bracket)
• PTT unit
• Shaft (upper side)
• E-clip
• Shaft (lower side)
• Washer
• Shaft bolt
• Ground lead
• Ground lead bolt
2.
Route:
• PTT motor lead
• Plastic tie
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Route the PTT motor lead “1” through the
hole “a” in the clamp bracket “2” (STBD),
and then fasten the PTT motor lead to the
clamp bracket (STBD) with a new plastic
tie “3”.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Ram
PTT motor lead
Battery
Retract
Green (G)
(+)
Blue (L)
(–)
Ram
PTT motor lead
Battery
Extend
Blue (L)
(+)
Green (G)
(–)
L
G
1
G
L
1
Reservoir cap
7 N·m (0.7 kgf·m, 5.2 lb·ft)
T
R
.
.
New
a
3
1
2
Summary of Contents for F30A 2018
Page 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Page 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Page 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Page 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Page 342: ...Jul 2018 ABE E ...