9-5
BRKT
Bracket unit
Removing the cowling lock lever
1.
Remove the spring
a
, and then remove
the hook
b
.
2.
Remove the lever
c
, wave washer
d
,
washer
e
, bushing
f
, cowling lock lever
g
, and bushing
h
.
Removing the flushing hose
1.
Remove the adapter
a
, plastic tie
b
,
joint
c
, joint
d
, and gasket
e
.
2.
Remove the holder
f
, bracket
g
, and
guide
h
, and then pull out the flushing
hose
i
, trim sensor lead
a
, and PTT
motor lead
b
.
3.
Remove the plastic ties
j
, and then
remove the grommet
k
, flushing hose
i
, trim sensor lead
a
, and PTT motor
lead
b
.
Installing the flushing hose
1.
Route the flushing hose
a
, trim sensor
lead
a
, and PTT motor lead
b
through
the grommet
b
, and then fasten them
using plastic ties
c
around the grommet
b
.
2.
Install the grommet
b
and guide
d
.
TIP:
Align the white paint mark
c
on the flushing
hose
a
with the outer end of the grommet
b
,
and align the white tape
d
on the PTT motor
lead
b
with the inner end of the grommet
b
.
3.
Route the flushing hose
a
, trim sensor
lead
a
, and PTT motor lead
b
, and then
fasten the flushing hose
a
, trim sensor
lead
a
, and PTT motor lead
b
using the
bracket
d
.
4.
Fasten the flushing hose
a
and trim
sensor lead
a
using the holder
e
.
a
b
c
d
e
f
g
h
a
b
c
d
e
i
f
a
g
b
h
i
k
j
j
a
b
a
a
b
c
c
c
c
c
b
b
d a
a
d
Summary of Contents for F225F
Page 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Page 4: ......
Page 54: ...1 31 SPEC Specification MEMO ...
Page 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Page 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 562: ...A 1 MEMO ...
Page 565: ......
Page 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Page 576: ...A 13 ...