5-68
PTT electrical system
0
1
2
3
4
5
6
7
8
9
10
A
10. Remove the fuse holder
b
, and then
disconnect the fuse holder coupler
k
.
11. Disconnect the engine ECM coupler
m
.
12. Check the wiring harness for continuity.
13. Connect the PTT relay coupler
c
.
14. Connect the PTT relay leads, PTT motor
leads, and PTT relay coupler.
15. Connect the fuse holder coupler
k
, and
then install the fuse holder
b
.
16. Install the intake manifold (STBD). See
“Installing the intake manifold” (6-16).
17. Connect the engine ECM coupler
m
.
Checking the PTT switch (bottom
cowling)
1.
Disconnect the PTT switch coupler
a
.
2.
Measure the input voltage between the
PTT switch coupler terminal and ground.
A
Regular rotation model
B
Counter rotation model
3.
Check the PTT switch for continuity.
Replace if out of specification.
Wiring harness continuity:
Terminal 1–Terminal 113
Terminal 2–Terminal 16
Terminal 3–Terminal 112
k
b
m
16
c
k
m
3
2
1
112
113
PTT switch input voltage:
Red (R)–Ground
12.0 V (battery voltage)
a
R
A
a
R
B
Lg
R
Sb
b
c d
Summary of Contents for F225F
Page 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Page 4: ......
Page 54: ...1 31 SPEC Specification MEMO ...
Page 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Page 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 562: ...A 1 MEMO ...
Page 565: ......
Page 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Page 576: ...A 13 ...