3-12
3
3.
Connect the isolator coupler
a
.
Installing the battery cable
1.
Route the battery cable through the bot-
tom cowling.
2.
Connect the negative battery cable
a
,
and then tighten the negative battery
cable nut
1
to the specified torque.
3.
Connect the positive battery cable
b
.
4.
Install the rubber cap
2
.
Installing the speed sensor
(optional)
See 6Y8 Multifunction Meter set up manual
for details of the components.
1.
Remove the engine ECM cover
1
.
2.
Cut off the tip
a
of the nipple
2
.
3.
Install the extension hose
3
to the nipple
2
, and then fasten it using the plastic tie
4
.
TIP:
Cut the extension hose
3
to 50 mm (2.0 in).
4.
Install the tube
5
.
Negative battery cable nut
1
:
13 N·m (1.3 kgf·m, 9.6 ft·lb)
a
2
b
a
1
2
1
2
a
3
2
4
5
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...