3-9
RIG
GING
Rigging information
Rigging grommet mounting
Rigging grommet description
a
Throttle cable
b
Extension wiring harness
c
Water temperature sensor harness
(optional) or water pressure sensor hose
(optional)
d
Isolator lead (optional)
e
Battery cable
f
Conventional gauge lead (optional) or 6Y8
Multifunction Meter harness (optional)
g
Fuel hose
h
Speedometer hose
k
Shift cable
m
Flushing hose (commercially available)
Installing the shift cable and throttle
cable
Before installing the shift cable and throt-
tle cable, make sure to adjust the cables
according to the procedures in the remote
control operation manual.
1.
Remove the rubber seal
1
from the
retaining plate
2
.
2.
Remove the retaining plate
2
.
3.
Remove the rigging grommet
3
.
4.
Remove the cable holder
4
.
5.
Route the shift cable
5
through the bot-
tom cowling.
6.
Fit the cable holder
4
into the groove
a
in the shift cable
5
, and then install the
cable holder
4
along with the shift cable
5
.
m
a
b
c
d
e
f
g
h
k
1
2
2
3
4
a
5
4
5
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...