E
3-9
3)
Second hour:
Accelerate at full throttle onto plane,
then reduce engine speed to three-
quarter throttle (approximately 4,000
r/min). Vary engine speed occasional-
ly. Run at full throttle for one minute,
then allow about 10 minutes of opera-
tion at three-quarter throttle or less to
let the engine cool.
4)
Third through tenth hours:
Avoid operating at full throttle for
more than 5 minutes at a time. Let the
engine cool between full-throttle runs.
Vary engine speed occasionally.
5)
After the first 10 hours:
Operate the engine normally. Use the
standard premix ratio of gasoline :
Oil. (Refer to “Gasoline/Petrol and Oil
Mixing”.)
63D-9-15-3 4/18/01 10:45 AM Page 10
Summary of Contents for C40A
Page 1: ...C40A C50A LIT 18626 04 75 C40A C50A OWNER S MANUAL U S A Edition ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 22: ...E MEMO ...
Page 66: ...4 11 E EMU00366 GREASING Yamaha marine grease Water resistant grease ...
Page 94: ... MEMO E ...
Page 95: ...EMP00010 Chapter 6 INDEX INDEX 6 1 1 2 3 4 5 6 E ...
Page 104: ......
Page 105: ......
Page 107: ...C40A C50A OWNER S MANUAL ...