3-9
ADJUSTING THE VALVE CLEARANCE/
ADJUSTING THE ENGINE IDLING SPEED
CHK
ADJ
NOTE:
10 Nm (1.0 m
S
kg)
18 Nm (1.8 m
S
kg)
13 Nm (1.3 m
S
kg)
NOTE:
Locknut:
7 Nm (0.7 mkg)
e. Measure the valve clearance again.
f. If the valve clearance is still out of specifica-
tion, repeat all of the valve clearance adjust-
ment steps until the specified clearance is
obtained.
11. Install:
S
all removed parts
Install all removed parts in the reverse order of
their disassembly. Note the following points.
S
camshaft sprocket covers
S
tappet covers
S
spark plugs
EAS00054
ADJUSTING THE ENGINE IDLING SPEED
Prior to adjusting the engine idling speed, the air
filter should be clean, and the engine should
have adequate compression.
1. Start the engine and let it warm up for several
minutes.
2. Install:
S
engine tachometer
(to the spark plug lead of cyl. #1)
Engine tachometer
90890-03113
3. Check:
S
engine idling speed
Out of specification
Adjust.
Engine idling speed
1,200
X
1,400 r / min
4. Adjust:
S
engine idling speed
Summary of Contents for 5KR2
Page 1: ......
Page 2: ......
Page 8: ......
Page 9: ......
Page 11: ...GEN INFO ...
Page 19: ......
Page 20: ......
Page 22: ...SPEC ...
Page 45: ...2 23 ENGINE OIL FLOW DIAGRAMS SPEC EB205000 ENGINE OIL FLOW DIAGRAMS ...
Page 46: ...2 24 ENGINE OIL FLOW DIAGRAMS SPEC ...
Page 47: ...2 25 ENGINE OIL FLOW DIAGRAMS SPEC ...
Page 56: ......
Page 57: ......
Page 108: ......
Page 178: ......
Page 179: ......
Page 250: ......
Page 252: ...CARB ...
Page 267: ...6 15 A From air cleaner B To reed valve AIR INDUCTION SYSTEM CARB EAS00508 ...
Page 274: ......
Page 275: ......
Page 277: ...ELEC ...
Page 308: ...7 31 SIGNALING SYSTEM ELEC SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 321: ......
Page 322: ......
Page 324: ...TRBL SHTG ...
Page 330: ......