7-23
SIGNALING SYSTEM
SIGNALING SYSTEM
INSPECTION STEPS
If the speedometer will not operate, use the following inspection steps.
*1 marked: Refer to "CHECKING AND CHARGING THE BATTERY" section in the CHAPTER 3.
• Remove the following parts before inspection.
1. Headlight
• Use the following special tools in this inspection.
*1 Check battery.
No good
→
Recharge or replace.
OK
↓
Check each coupler and wire connec-
tion.
No good
→
Repair or replace.
OK
↓
Check multi-function display. (Input volt-
age)
No good
→
Replace wire harness.
OK
↓
Check multi-function display. (Output
voltage)
No good
→
Replace multi-function display.
OK
↓
Check speed sensor.
No good
→
Replace.
Pocket tester:
YU-3112-C/90890-03112
Summary of Contents for 2011 WR250FA
Page 6: ...YAMAHA MOTOR CORPORATION U S A WR MOTORCYCLE LIMITED WARRANTY ...
Page 10: ...MEMO ...
Page 62: ...2 22 LUBRICATION DIAGRAMS LUBRICATION DIAGRAMS ...
Page 64: ...2 24 LUBRICATION DIAGRAMS ...
Page 66: ...2 26 CABLE ROUTING DIAGRAM CABLE ROUTING DIAGRAM ...
Page 68: ...2 28 CABLE ROUTING DIAGRAM ...
Page 70: ...2 30 CABLE ROUTING DIAGRAM ...
Page 72: ...2 32 CABLE ROUTING DIAGRAM ...
Page 74: ...2 34 CABLE ROUTING DIAGRAM ...
Page 117: ...3 42 CHASSIS ...
Page 118: ...3 43 CHASSIS LUBRICATION ...
Page 123: ...3 48 ELECTRICAL Charging method using a variable voltage charger ...
Page 124: ...3 49 ELECTRICAL Charging method using a constant voltage charger ...
Page 314: ......
Page 315: ......