PERIODIC MAINTENANCE AND ADJUSTMENT
7-10
7
3. Remove the bolts and the quick
fastener, and then pull the cowling
off as shown.
To install the cowling
1. Fit the slot in cowling C over the
projection on the front cowling.
2. Install the bolts and the quick fas-
tener.
3. Place the wire harness in the orig-
inal position, and then close the
plastic fastener.
4. Install the cowling and the panel.
EAU39060
Panels A and B
To remove one of the panels
Remove the bolts, and then pull the
panel off as shown.
To install the panel
Place the panel in the original position,
and then install the bolts.
1. Plastic fastener
2. Projection
3. Wire harness
1. Cowling C
2. Bolt
3. Quick fastener
1. Cowling C
2. Slot
3. Front cowling
4. Projection
1. Panel B
2. Bolt
U13S21E0.book Page 10 Tuesday, July 8, 2008 9:23 AM
Summary of Contents for 2009 YZF-R6Y
Page 9: ...LOCATION OF IMPORTANT LABELS 1 2 1 U13S21E0 book Page 2 Tuesday July 8 2008 9 23 AM ...
Page 108: ...A5 yoko_Blank fm Page 1 Tuesday April 8 2003 11 43 AM ...
Page 109: ...A5 yoko_Blank fm Page 1 Tuesday April 8 2003 11 43 AM ...
Page 110: ...PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD PRINTED IN JAPAN 2008 07 0 3 1 CR E DIC183 ...