PERIODIC MAINTENANCE
3-7
TIP
The thickness “a” of each valve pad is marked in
hundredths of millimeters on the side that touch-
es the valve lifter.
Example:
If the valve pad is marked “158”, the pad
thickness is 1.58 mm (0.062 in)
d. Calculate the sum of the values obtained in
steps (b) and (c) to determine the required
valve pad thickness and the valve pad num-
ber.
Example:
1.58 mm (0.062 in) + 0.05 mm (0.002 in) =
1.63 mm (0.064 in)
The valve pad number is 163.
e. Round off the valve pad number according to
the following table, and then select the suit-
able valve pad.
TIP
Refer to the following table for the available
valve pads.
Example:
Valve pad number = 163
Rounded value = 165
New valve pad number = 165
f. Install the new valve pad “1” and the valve lift-
er “2”.
TIP
●
Lubricate the valve pad with molybdenum dis-
ulfide grease.
●
Lubricate the valve lifter with molybdenum dis-
ulfide oil.
●
The valve lifter must turn smoothly when rotat-
ed by hand.
●
Install the valve lifter and the valve pad in the
correct place.
g. Install the exhaust and intake camshafts, tim-
ing chain and camshaft caps.
TIP
●
Refer to “CAMSHAFTS” on page 5-8.
●
Lubricate the camshaft bearings, camshaft
lobes and camshaft journals.
●
First, install the exhaust camshaft.
●
Align the camshaft marks with the camshaft
cap marks.
●
Turn the crankshaft counterclockwise several
full turns to seat the parts.
h. Measure the valve clearance again.
i. If the valve clearance is still out of specifica-
tion, repeat all of the valve clearance adjust-
ment steps until the specified clearance is
obtained.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
7. Install:
●
All removed parts
TIP
For installation, reverse the removal procedure.
EAS20610
ADJUSTING THE ENGINE IDLING SPEED
TIP
Before synchronizing the throttle bodies, check
the following items:
●
Valve clearance
Last digit
Rounded value
0,1,2
0
3,4,5,6
5
7,8,9
10
Valve pad range
Nos. 120
–
240
Valve pad thickness
1.20
–
2.40 mm
(0.0591
–
0.0945 in)
Available valve pads
25 thicknesses in
0.05 mm (0.002 in)
increments
Camshaft cap bolt
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
T
R
.
.
Summary of Contents for 2009 FZ6RC
Page 1: ...SERVICE MANUAL FZ6RY C 2009 36P 28197 10 LIT 11616 22 77 ...
Page 2: ......
Page 8: ......
Page 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EAS20410 LUBRICATION DIAGRAMS 1 5 3 2 4 ...
Page 56: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 3 7 8 2 1 4 6 5 ...
Page 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 3 6 5 1 2 4 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 2 4 5 3 ...
Page 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 3 2 5 4 1 ...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 2 3 1 ...
Page 65: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 38 1 Main axle 2 Drive axle 3 Oil pipe ...
Page 66: ...COOLING SYSTEM DIAGRAMS 2 39 EAS20420 COOLING SYSTEM DIAGRAMS 1 1 2 2 3 5 6 4 4 7 ...
Page 68: ...CABLE ROUTING 2 41 EAS20430 CABLE ROUTING ...
Page 70: ...CABLE ROUTING 2 43 ...
Page 72: ...CABLE ROUTING 2 45 ...
Page 74: ...CABLE ROUTING 2 47 ...
Page 76: ...CABLE ROUTING 2 49 ...
Page 78: ...CABLE ROUTING 2 51 ...
Page 80: ...CABLE ROUTING 2 53 ...
Page 82: ...CABLE ROUTING 2 55 ...
Page 84: ...CABLE ROUTING 2 57 ...
Page 86: ...CABLE ROUTING 2 59 ...
Page 88: ...CABLE ROUTING 2 61 ...
Page 90: ...CABLE ROUTING 2 63 ...
Page 92: ...CABLE ROUTING 2 65 ...
Page 94: ...CABLE ROUTING 2 67 ...
Page 96: ...CABLE ROUTING 2 69 ...
Page 98: ...CABLE ROUTING 2 71 ...
Page 100: ...ADJUSTING THE HEADLIGHT BEAMS 3 29 REPLACING THE HEADLIGHT BULBS 3 30 ...
Page 196: ...CHAIN DRIVE 4 64 ...
Page 244: ...OIL PUMP 5 46 1 2 ...
Page 308: ...AIR INDUCTION SYSTEM 7 11 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 2 3 6 ...
Page 315: ......
Page 316: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Page 320: ...ELECTRIC STARTING SYSTEM 8 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Page 326: ...CHARGING SYSTEM 8 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Page 327: ...CHARGING SYSTEM 8 12 1 AC magneto 2 Rectifier regulator 3 Battery 4 Main fuse ...
Page 329: ...CHARGING SYSTEM 8 14 ...
Page 330: ...LIGHTING SYSTEM 8 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Page 333: ...LIGHTING SYSTEM 8 18 ...
Page 334: ...SIGNALING SYSTEM 8 19 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Page 340: ...COOLING SYSTEM 8 25 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Page 343: ...COOLING SYSTEM 8 28 ...
Page 344: ...FUEL INJECTION SYSTEM 8 29 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Page 382: ...FUEL PUMP SYSTEM 8 67 EAS27550 FUEL PUMP SYSTEM EAS27560 CIRCUIT DIAGRAM ...
Page 385: ...FUEL PUMP SYSTEM 8 70 ...
Page 386: ...ELECTRICAL COMPONENTS 8 71 EAS27970 ELECTRICAL COMPONENTS 2 1 3 4 5 6 10 8 9 11 7 12 13 14 15 ...
Page 388: ...ELECTRICAL COMPONENTS 8 73 2 1 3 4 5 6 10 8 9 7 11 12 13 ...
Page 390: ...ELECTRICAL COMPONENTS 8 75 EAS27980 CHECKING THE SWITCHES 7 8 9 12 11 14 10 4 1 2 3 5 6 13 ...
Page 410: ...ELECTRICAL COMPONENTS 8 95 ...
Page 417: ......
Page 418: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...
Page 419: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 1 ...
Page 420: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 2 ...