2-34
CABLE ROUTING
SPEC
G Fasten the throttle cables and starter cable with a
band.
Locate the end of band to forward.
H Route the horn lead outside the throttle cables and
fasten it to the under bracket with a plastic locking
tie. Cut the end of locking tie. And then, route the
horn lead under the brake hose and clamp it to the
under cover.
Summary of Contents for 1999 YZF-R6
Page 1: ......
Page 2: ......
Page 8: ......
Page 9: ...GEN INFO 1 ...
Page 11: ...GEN INFO ...
Page 23: ...GEN INFO ...
Page 24: ...SPEC 2 ...
Page 26: ...SPEC ...
Page 47: ...2 21 TIGHTENING TORQUES SPEC Crankcase tightening sequence ...
Page 52: ...2 26 OIL FLOW DIAGRAMS SPEC 1 Exhaust camshaft 2 Intake camshaft 3 Oil filter 4 Oil cooler ...
Page 53: ...2 27 OIL FLOW DIAGRAMS SPEC 1 Cylinder head 2 Crankshaft ...
Page 54: ...2 28 OIL FLOW DIAGRAMS SPEC 1 Main axle 2 Oil delivery pipe 3 driveaxle ...
Page 55: ...2 29 1 Radiator 2 Radiator fan 3 Oil cooler COOLANT FLOW DIAGRAMS SPEC COOLANT FLOW DIAGRAMS ...
Page 56: ...2 30 COOLANT FLOW DIAGRAMS SPEC 1 Thermostat housing 2 Thermostat 3 Radiator 4 Therm ...
Page 58: ...2 32 1 Radiator 2 Radiator fan switch 3 Radiator fan COOLANT FLOW DIAGRAMS SPEC ...
Page 66: ...SPEC ...
Page 67: ...CHK ADJ 3 ...
Page 137: ...CHK ADJ ...
Page 138: ...ENG 4 ...
Page 232: ...ENG ...
Page 233: ...COOL 5 ...
Page 235: ...COOL ...
Page 253: ...COOL ...
Page 254: ...CARB 6 ...
Page 256: ...CARB ...
Page 274: ...CARB ...
Page 275: ...CHAS 7 ...
Page 353: ...CHAS ...
Page 354: ...ELEC 8 ...
Page 391: ...8 35 SIGNALING SYSTEM ELEC EB806000 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 414: ...ELEC ...
Page 415: ...TRBL SHTG 9 ...
Page 423: ...TRBL SHTG ...