7
An ASSA ABLOY Group brand
P/N AYRT-220-INST-FUL Rev A
Figure 1A
Outside Escutcheon
(with gasket)
Do not remove clip from Outside Escutcheon shank until correct handing has
been determined and Outside Lever Handle is to be installed.
(See page 9)
Clip
Shank
NOTE: RED marking
indicates "top" of hub
1. From outside of door, position the outside escutcheon by first routing the cable
through 2-1/8" diameter hole and
under
the latch (Fig. 3A & B), then insert
posts
*
and tailpiece into the latch.
Square
Drive Tube
is marked
(WHITE) to
indicate
"top"
NOTE
: The "tops" of both the square drive tube and the hub (in the shank) are
marked
to
indicate their orientation for proper installation (Figures A & B).
Shank
NOTE: Cable goes
under latch (Fig. 1A & 1B).
Outside of Door
Figure 1B
Inside of Door
"Top" of Drive Tube
(marked WHITE)
Tailpiece
*
Posts are inserted in holes according to
backset adjustment. (Refer back to Detail 1A
under "Install Lock")
Install Outside Escutcheon
Figure A
Figure B